Your search for 'iwi map' returned 2177 results.

Manawa Energy Motukawa HEP Scheme Annual Report 2021-2022

L/s residual flow (2002-2020), previous period (2020-2021), and current year (2021-22) 20 Figure 9 Manganui River water temperature differences between sites upstream and downstream of the Motukawa HEP weir compared with the flow in the Manganui River at Everett Park from 8 November to 8 December 2018 21 Figure 10 Map showing sampled sites with current survey results 22 page iv Figure 11 Cumulative weight of elvers transferred from the Motukawa Power Station

Annual report 2009-2010

1995-2010 SEM (TRC and NIWA) sites’ water quality with guideline values for various usages 62 Table 39 Comparison of 2009-2010 water quality with previous long-term (1995-2009) data (using median values) for each SEM site 66 page iv List of figures Figure 1 Freshwater physicochemical SEM sampling sites 4 Figure 2 Freshwater physicochemical SEM sampling sites aerial map 5 Figure 3 Flow record for the Mangaoraka Stream at Corbett Road 14 Figure 4 Flow record for the

Annual report 2014-2015

Trucking Company Limited’s cleanfill, Cardiff Road, Stratford 67 Table 29 Summary of performance for Taranaki Trucking Company Limited’s consent 5561-1 68 Table 30 Summary of performance for Taranaki Trucking Company Limited’s consent 6280-1 69 Table 31 Summary of performance for V Rowe Family Trust & CG Bayliss Family Trust Partnership’s consent 9411-1 73 page vii List of figures Figure 1 Regional map showing the locations of the cleanfills

Boyd consent monitoring report 2017-2018

Derby Road stockpiling facility with sampling locations and regional insert Site data Location Word descriptor: Derby Road North, Inglewood, Taranaki Map reference: E 1702545 (NZTM) N 5653650 Mean annual rainfall: 1,942 mm Mean annual soil temperature: - Mean annual soil moisture: - Elevation: ~500 MASL Geomorphic position: Ring plain Erosion / deposition: Negligible Vegetation: Transitional – native bush to pasture

Combined biennial report 2015-2017

2015-2017 monitoring period 67 Table 30 Summary of compliance with consent 5002-2 over the 2015-2017 monitoring period 70 Table 31 Summary of compliance with consent 9570-1 over the 2015-2017 monitoring period 74 Table 32 Summary of compliance with consent 9972-1.2 over the 2015-2017 monitoring period 74 List of figures Figure 1 Reporting cycles for both combined quarry groups 1 Figure 2 Map showing monitored quarrying locations in Taranaki 5 Figure 3 AA Contracting Ltd

Biennial report 2011-2013

groundwater concentrations in relation to New Zealand Drinking Water Standard limits during the 2011- 2013 monitoring period at Surrey Road stockpiling facility 35 Figure 10 Total dissolved solids groundwater concentrations during the 2011- 2013 monitoring period at Surrey Road stockpiling facility 35 Figure 11 Aerial photo displaying the biomonitoring sites in an unnamed tributary of the Mangatengehu Stream 37 page v Figure 12 Aerial map of the extent of Colin Boyd's

Greymouth Petroleum Ltd Turangi B Hydraulic Fracturing Report 2019-2021

Results of groundwater sampling carried out in relation to the Turangi-B fracturing events 11 Table 6 Results of hydraulic fracturing fluid sampling 13 Table 7 Results of hydraulic fracturing return fluid sampling 13 Table 8 Summary of performance for consent 7952-2 15 List of figures Figure 1 Location map 4 page 1 1 Introduction 1.1 Compliance monitoring programme reports and the Resource Management Act 1991 1.1.1 Introduction This

Land Transport Plan monitoring report 2018-2019

activities. As part of applying the NZ Transport Agency’s required Business Case Approach, a number of stakeholder Investment Logic Mapping (ILM) workshops were held throughout the region for specific transport projects and Asset/Activity Management Plans. 2) An effective, efficient and resilient land transport system that enhances economic wellbeing, growth and productivity in the Taranaki region and beyond. All maintenance and improvements

Radnor B hydraulic fracturing report 2018-2019

7 Table 4 Surface water monitoring site details 8 Table 5 Results of groundwater sampling carried out in relation to the Radnor-2 fracturing event 10 Table 6 Results of hydraulic fracturing fluid sampling 11 Table 7 Results of hydraulic fracturing return fluid sampling 12 Table 8 Summary of performance for consent 10348-1 15 List of figures Figure 1 Location map 5 page 1 1 Introduction 1.1 Compliance monitoring programme reports and