Your search for 'iwi map' returned 2244 results.

Biennial report 2012-2014

Todd McKee production station & power plant consent monitoring report - Taranaki Regional Council.

Boyd consent monitoring report 2018-2019

surrendered on 3 January 2019. The monitoring reported is strictly limited to between July 2018 and January 2019 in the following Derby Road related portion of this report. page 13 Figure 2 Derby Road stockpiling facility with sample collection locations Site data Location Word descriptor: Derby Road North, Inglewood, Taranaki Map reference: E 1702545 (NZTM) N 5653650 Mean annual rainfall: 1,942 mm Mean annual soil temperature: -

total mobility around new zealand

map is available on request. Transport operators The following transport operators provide total mobility services and some provide wheelchair hoist services as indicated. Two vans are available in Whāngārei at any one time. Please remember that you may need to pre-book a wheelchair accessible vehicle. APPROVED TRANSPORT OPERATOR CONTACT NUMBER WHEELCHAIR ACCESSIBILITY Kiwi Cabs 09 438 4444 Hoist available A1 Cabs 09 438 3377 Hoist available Costs Level of subsidy per trip

Annual report 2013-2014

was in place and plants purchased form Council were on site for this purpose. The monitoring of this last section of reinstatement was undertaken by Council land management department which reports that the works had been completed and that further plantings had been undertaken at various places around the site. A copy of the riparian plan map is attached as Appendix II. Overall the site was managed well and the extensive quarry reinstatement plantings have continued. 2.2

Annual report 2013-2014

layout of Eltham wastewater treatment plant as operational prior to the diversion of wastewater to the Hawera WWTP in the 2010-2011 period 7 Figure 2 Aerial view of the Eltham WWTP showing the sludge geo- textile bags disposal area 7 Figure 3 Location of sampling sites in relation to the Eltham wastewater treatment system 22 Figure 4 Aerial location map 23 page iv List of photos Photo 1 Overflow retention pond, 21 July 2011 8 Photo 2 Replacement aerator,

NPDC Eltham Central Landfill Baseline Monitoring Annual Report 2020 2021

performance for dam and diversion consent 5350-1 48 Table 12 Summary of performance for structures consent 5351-1 49 List of figures Figure 1 Regional map of Taranaki showing the location of the Central landfill site 4 Figure 2 Aerial view of the Central landfill site and sampling points, up to June 2017 13 Figure 3 Increased Central landfill monitoring network, July 2017 onward 14 Figure 4 Central landfill surface water monitoring sites 16 Figure 5 Ammoniacal nitrogen levels

Remediation hearing - applicant's evidence - expert evidence (iwi concerns)

Table 1 presents a summary of median and maximum TAN results for each surface water monitoring location, relevant obtained pH data equivalent to the TAN statistic, and the consequent TAN concentration once recalculated to a pH of 8.0. A map of the monitoring locations presented in Table 1 is presented in Appendix B. page 7 R E M E D I A T I O N N E W Z E A L A N D L I M I T E D - U R U T I C O M P O S T I N G F A C I L I T Y – W A T E R Q U A L I T Y M A N A G