McKee power plant consent monitoring 2018-2019
McKee power plant consent monitoring report 2018-2019
McKee power plant consent monitoring report 2018-2019
be discharged; (i) a map or aerial image identifying the specific area where the discharge is to occur; (ii) a calculation of the Nitrogen loading of the discharge proposal; (iii) test results from a representative sample of the waste to be discharged showing that it meets the standards shown in the table below; (iv) details of the sampling procedure showing that the test sample is representative of the wastes; and (b) the Chief Executive, Taranaki Regional Council, having
Table 7 Low flow receiving water results, January 2019 12 Table 8 Summary of performance for consent 0196-4 16 Table 9 Evaluation of environmental performance over time 17 List of figures Figure 1 Aerial location map of sampling sites in relation to Stratford WWTP 10 List of photos Photo 1 Stratford WWTP 4 Photo 2 View of Stratford WWTP primary pond with aerators operating 9 page 1 1 Introduction 1.1 Compliance monitoring programme reports and
Nova McKee Power Plant consent monitoring report 2017-2018
project and STDC’s Pathways for People activities. As part of applying the NZ Transport Agency’s required Business Case Approach, a number of stakeholder Investment Logic Mapping (ILM) workshops were held throughout the region for specific transport projects and Asset/Activity Management Plans. 2) An effective, efficient and resilient land transport system that enhances economic wellbeing, growth and productivity in the Taranaki region and
Target will not be achieved Delayed Overdue page Resource management QUARTERLY OPERAT IONAL REPORT – SEPTEMBER 2018 13 Sustainable land management plans and plant supply programme Promoting sustainable land and riparian management by providing land management advice and information on an individual property basis and through advocacy and facilitation. Commentary/Highlights The commissioning and mapping of riparian plans is the focus for this
regional councils, to enhance knowledge base for policy development and implementation. Projects with clear relevance and benefit to Taranaki to be adopted by "Envirolink" and other funding opportunities (advocacy to be reported through Council's annual report processes). Envirolink projects encompassing a High Intensity Rainfall Design System, Discrete Water Quality Sampling Standards, farm scale soil mapping and applications, aquatic weeds management, assessment
Nova Energy McKee Power Plant consent monitoring report 2016-2017
performance for consent 4094-2 20 Table 11 Summary of performance for consent 10086-1 21 List of figures Figure 1 DWI schematic (www.epa.gov/uic) 4 Figure 2 Waihapa and Waitapu wellsites and consent location map 7 Figure 3 Groundwater monitoring bore sites in relation to injection wells 10 Figure 4 Total daily injection volume consent 4094-2 (2015-2016) 16 Figure 5 Total daily maximum injection pressure consent 4094-2-1 (2015-2016) 16 Figure 6 Total daily injection volume consent
River for the construction and maintenance of the South Taranaki 31 List of figures Figure 1 Regional map of the site showing the position of the location landfill site 4 Figure 2 Aerial view of Eltham Central landfill site and sampling points 13 Figure 3 Ammoniacal nitrogen levels found in surface water at the Central landfill site, 2005-2013 15 Figure 4 Suspended solids levels found in surface water at the Central landfill site, 2005-2013 16 Figure 5