performance for dam and diversion consent 5350-1 48
Table 12 Summary of performance for structures consent 5351-1 49
List of figures
Figure 1 Regional map of Taranaki showing the location of the Central landfill site 4
Figure 2 Aerial view of the Central landfill site and sampling points, up to June 2017 13
Figure 3 Increased Central landfill monitoring network, July 2017 onward 14
Figure 4 Central landfill surface water monitoring sites 16
Figure 5 Ammoniacal nitrogen levels
monitoring period 65
Table 30 Summary of compliance with consent 1509-3 over the 2017-2018 monitoring period 66
Table 31 Summary of compliance with consent 1509-4 over the 2017-2018 monitoring period 67
page
v
List of figures
Figure 1 Previous reporting cycles for combined quarry groups 'A' and 'B' 1
Figure 2 Map showing monitored quarrying locations in Taranaki 6
Figure 3 AA Contracting Limited Quarry site 13
Figure 4 Map of Coastal Drainage/Jones
consent 6280-1 75
page
viii
List of figures
Figure 1 Regional map showing the locations of the cleanfills monitored under
this programme during the year under review 5
Figure 2 AA Contracting Ltd’s cleanfill and sampling sites at Henwood Road,
New Plymouth 11
Figure 3 A & A George Family Trust cleanfill at Dudley Road, New Plymouth 17
Figure 4 AE Riddick’s cleanfill and sampling site at Carrington Road, New
Plymouth 22
Figure 5 BJ & LB Bishop’s
Todd McKee production station & power plant consent monitoring report - Taranaki Regional Council.
surrendered on 3 January 2019. The monitoring reported is strictly limited to
between July 2018 and January 2019 in the following Derby Road related portion of this report.
page
13
Figure 2 Derby Road stockpiling facility with sample collection locations
Site data
Location
Word descriptor: Derby Road North, Inglewood, Taranaki
Map reference: E 1702545
(NZTM) N 5653650
Mean annual rainfall: 1,942 mm
Mean annual soil temperature: -
maps, photographs, GPS and map references on
the internal electronic TRC site reference system (ESAM) which is integrated into the existing LAB water quality
computer and Taradise GIS databases.
A brief description of all sites in the Taranaki Regional Council and NIWA programmes follows.
Site Maketawa Stream at Tarata Road
This site, in the lower reaches of a developed farmland catchment is representative of a sub-catchment of the
Manganui and Waitara Rivers catchments, with valued
Port Taranaki Ltd resource consent monitoring report 2018-2020
OMV Pohokura production station consent monitoring report 2018-2019
layout of Eltham wastewater treatment plant as
operational prior to the diversion of wastewater to the
Hawera WWTP in the 2010-2011 period 7
Figure 2 Aerial view of the Eltham WWTP showing the sludge geo-
textile bags disposal area 7
Figure 3 Location of sampling sites in relation to the Eltham
wastewater treatment system 22
Figure 4 Aerial location map 23
page
iv
List of photos
Photo 1 Overflow retention pond, 21 July 2011 8
Photo 2 Replacement aerator,
Table 1 presents a summary of median and maximum TAN results for each
surface water monitoring location, relevant obtained pH data equivalent to the
TAN statistic, and the consequent TAN concentration once recalculated to a pH
of 8.0.
A map of the monitoring locations presented in Table 1 is presented in Appendix
B.
page
7
R E M E D I A T I O N N E W Z E A L A N D L I M I T E D - U R U T I C O M P O S T I N G F A C I L I T Y – W A T E R Q U A L I T Y M A N A G