Your search for 'iwi map' returned 2227 results.

Irrigation Water Monitoring Annual Report 2020 2021

Figure 3 Total consented water abstractions – distributed by activity 2020-2021 4 Figure 4 Pasture irrigation zones and locations of consented irrigation in Taranaki 5 Figure 5 Distribution map of the total rainfall recorded from 1 December 2020 to 31 March 2021 10 List of photos Photo 1 Mosaic of pictures depicting k-line long lateral type irrigation 6 Photo 2 Picture depicting centre pivot 6 Photo 3 Picture depicting travelling irrigator system 7 Photo 4 An example of

Application Appendix I Terrestrial Ecology Assessment 20 02053 4 0 + 5 other renewals Trustpower 25 Nov 2020

page Trustpower – Mangorei HEPS Terrestrial Ecology Assessment 7 Ryder Environmental Ltd Figure 1. Aerial map showing location of structures and surface waters associated with the Mangorei HEPS. page Trustpower – Mangorei HEPS Terrestrial Ecology Assessment 8 Ryder Environmental Ltd Ecological context The HEPS and the above sites are located entirely within the Egmont Ecological District in the Egmont Ecological Region (McEwen

Stratford wastewater treatment monitoring 2019-2020

for consent 0196-5 (current from 1 May 2020) 18 Table 11 Evaluation of environmental performance over time 19 List of figures Figure 1 Aerial location map of sampling sites in relation to Stratford WWTP 11 Figure 2 Biomonitoring sites in the Patea River in relation to the Stratford landfill and wastewater discharge 14 List of photos Photo 1 Stratford WWTP 4 Photo 2 View of Stratford WWTP primary pond with aerators operating 10 page 1 1 …

7AEE AppendixE

individuals and organisations have been consulted in regards to the development of the site and the planned waste disposal. These have included; . Other landowners and occupiers within 550m . TRC; and NTDC. Uruti Remediation Site Page 8 of 19 Rev D 04/09/2017 page Health Safety Environment Interface Uruti Environmental Management Plan SITE LOCATION AND LAYOUT Figure 2 Site Location Property Map irn-nt iK-setteuisT-aiw 0 acHEtja. TSt B VEt3 n^da-

Remediation hearing - applicant's evidence - RNZ's offered conditions

be discharged; (i) a map or aerial image identifying the specific area where the discharge is to occur; (ii) a calculation of the Nitrogen loading of the discharge proposal; (iii) test results from a representative sample of the waste to be discharged showing that it meets the standards shown in the table below; (iv) details of the sampling procedure showing that the test sample is representative of the wastes; and (b) the Chief Executive, Taranaki Regional Council, having

Stratford wastewater treatment plant monitoring report 2018-2019

Table 7 Low flow receiving water results, January 2019 12 Table 8 Summary of performance for consent 0196-4 16 Table 9 Evaluation of environmental performance over time 17 List of figures Figure 1 Aerial location map of sampling sites in relation to Stratford WWTP 10 List of photos Photo 1 Stratford WWTP 4 Photo 2 View of Stratford WWTP primary pond with aerators operating 9 page 1 1 Introduction 1.1 Compliance monitoring programme reports and

Quarterly Operational Report September 2018

Target will not be achieved  Delayed  Overdue page Resource management QUARTERLY OPERAT IONAL REPORT – SEPTEMBER 2018 13 Sustainable land management plans and plant supply programme Promoting sustainable land and riparian management by providing land management advice and information on an individual property basis and through advocacy and facilitation. Commentary/Highlights The commissioning and mapping of riparian plans is the focus for this