Figure 3 Total consented water abstractions – distributed by activity 2020-2021 4
Figure 4 Pasture irrigation zones and locations of consented irrigation in Taranaki 5
Figure 5 Distribution map of the total rainfall recorded from 1 December 2020 to 31 March 2021 10
List of photos
Photo 1 Mosaic of pictures depicting k-line long lateral type irrigation 6
Photo 2 Picture depicting centre pivot 6
Photo 3 Picture depicting travelling irrigator system 7
Photo 4 An example of
page
Trustpower – Mangorei HEPS
Terrestrial Ecology Assessment 7
Ryder Environmental Ltd
Figure 1. Aerial map showing location of structures and surface waters associated with the
Mangorei HEPS.
page
Trustpower – Mangorei HEPS
Terrestrial Ecology Assessment 8
Ryder Environmental Ltd
Ecological context
The HEPS and the above sites are located entirely within the Egmont Ecological
District in the Egmont Ecological Region (McEwen
for consent 0196-5 (current from 1 May 2020) 18
Table 11 Evaluation of environmental performance over time 19
List of figures
Figure 1 Aerial location map of sampling sites in relation to Stratford WWTP 11
Figure 2 Biomonitoring sites in the Patea River in relation to the Stratford landfill and wastewater
discharge 14
List of photos
Photo 1 Stratford WWTP 4
Photo 2 View of Stratford WWTP primary pond with aerators operating 10
page
1
1 …
individuals and organisations have been consulted in regards to the
development of the site and the planned waste disposal. These have included;
. Other landowners and occupiers within 550m
. TRC; and NTDC.
Uruti Remediation Site Page 8 of 19 Rev D 04/09/2017
page
Health Safety Environment Interface Uruti Environmental Management Plan
SITE LOCATION AND LAYOUT
Figure 2 Site Location
Property Map
irn-nt iK-setteuisT-aiw
0
acHEtja. TSt
B VEt3
n^da-
McKee power plant consent monitoring report 2018-2019
be discharged;
(i) a map or aerial image identifying the specific area where the discharge is to
occur;
(ii) a calculation of the Nitrogen loading of the discharge proposal;
(iii) test results from a representative sample of the waste to be discharged
showing that it meets the standards shown in the table below;
(iv) details of the sampling procedure showing that the test sample is
representative of the wastes; and
(b) the Chief Executive, Taranaki Regional Council, having
Table 7 Low flow receiving water results, January 2019 12
Table 8 Summary of performance for consent 0196-4 16
Table 9 Evaluation of environmental performance over time 17
List of figures
Figure 1 Aerial location map of sampling sites in relation to Stratford WWTP 10
List of photos
Photo 1 Stratford WWTP 4
Photo 2 View of Stratford WWTP primary pond with aerators operating 9
page
1
1 Introduction
1.1 Compliance monitoring programme reports and
Nova McKee Power Plant consent monitoring report 2017-2018
Target will not be achieved
Delayed
Overdue
page
Resource management
QUARTERLY OPERAT IONAL REPORT – SEPTEMBER 2018 13
Sustainable land management plans and plant supply programme
Promoting sustainable land and riparian management by providing land management advice and information on an individual
property basis and through advocacy and facilitation.
Commentary/Highlights
The commissioning and mapping of riparian plans is the focus for this