Your search for 'iwi map' returned 2227 results.

Annual report 2015-2016

Summary of performance for Consent 3890-3 (Huiroa) 21 Table 8 Summary of performance for Consent 3891-2 (Pukengahu) 25 Table 9 Summary of performance for Consent 3890-2 (Pukengahu) 25 List of figures Figure 1 Regional map showing SDC landfill sites 6 Figure 2 Stratford landfill (shaded in yellow) and sampling locations 8 Figure 3 Graph showing chloride levels in groundwater at the Stratford landfill 12 page iii Figure 4 Graph showing ammoniacal nitrogen

Annual report 2014-2015

figures Figure 1 Regional map showing SDC landfill sites 5 Figure 3 Stratford landfill (shaded in yellow) and sampling locations 8 Figure 4 Graph showing chloride levels in groundwater at the Stratford landfill 12 Figure 5 Graph showing ammoniacal nitrogen levels in groundwater at the Stratford landfill 13 Figure 6 Graph showing zinc levels in groundwater at the Stratford landfill 13 Figure 7 Graph showing ammoniacal nitrogen levels in the Patea Stream up and downstream of the

Application Attachment Appendix C Hydrology Assessment Manawa Energy 14 Feb 2023

considered more reliable as they are determined from a LINZ digital topographic map layer. Table 2.1 Flow recording sites in the Waitara catchment as listed in NIWA’s national site index The longest available flow records are for the Manganui at SH3, with continuous data available from 31 May 1972 (i.e. 48.5 years of data) and for the Waitara at Tarata, with continuous data from 18 Number Sitename Start date End date Recording authority NZMS260 Catchment (km 2 ) 39501 Waitara at Tarata 18-Dec-68

Mangahewa G hydraulic fracturing report 2018-2020

hydraulic fracturing return fluid sampling 16 Table 8 Results of hydraulic fracturing return fluid sampling 18 Table 9 Summary of performance for consent 10025-2.1 21 List of figures Figure 1 Location map 5 page 1 1 Introduction 1.1 Compliance monitoring programme reports and the Resource Management Act 1991 1.1.1 Introduction This report outlines and discusses the results of the monitoring programme implemented by the Taranaki Regional …

Eltham wastewater treatment plan monitoring report 2018-2019

figures Figure 1 Schematic layout of Eltham WWTP prior to the diversion of wastewater to the Hawera WWTP 4 Figure 2 Aerial view of the Eltham WWTP 5 Figure 3 Aerial map showing location of chemical and biomonitoring sampling sites 13 page 1 1 Introduction 1.1 Compliance monitoring programme reports and the Resource Management Act 1991 1.1.1 Introduction This report is for the period July 2018 to June 2019 by the Taranaki Regional Council (the Council) on

1RemediationAEE

or affected by the application 2.0 SITE DESCRIPTION 2.1 Location The site is located on State Highway 3 (1450 Mokau Road) approximately 2 kilometres south of the Uruti Village and lies within the catchment of the Haehanga Stream, which is a tributary of the Mimi River. The legal Description is PtSec4Blkll UpperWaitaraSD. Acopyofthetitleanda map of the property are included in Appendix 'A' Land Location: Legal Description: Certificate of Title: S/te Area: 1460 Mokau Road,

Land Transport Plan monitoring report 2016-2017

Pathways for People activities. As part of applying the NZ Transport Agency’s required Business Case Approach, a number of stakeholder Investment Logic Mapping (ILM) workshops were held throughout the region for specific transport projects and Asset/Activity Management Plans. 2) An effective, efficient and resilient land transport system that enhances economic wellbeing, growth and productivity in the Taranaki region and beyond. All maintenance and improvements works

Biennial report 2013-2015

Burgess & Crowley Ltd Quarry consent monitoring report - Taranaki Regional Council

Annual report 2013-2014

performance for consent 5349-1 to discharge up to 15,000 cubic metres/day of uncontaminated stormwater and 4,000 cubic metres/day of treated stormwater 28 Table 12 Summary of performance for consent 5351-1 to erect, place and maintain structures in the beds of unnamed tributaries of the Waingongoro River 29 List of figures Figure 1 Regional map of the site showing the position of the location landfill site 5 Figure 2 Aerial view of Eltham Central landfill site and sampling points

Regional Cleanfills consent monitoring 2017-2018

consent 6280-1 75 List of figures Figure 1 Regional map showing the locations of the cleanfills monitored under this programme during the year under review 5 Figure 2 AA Contracting Ltd cleanfill and sampling sites at Henwood Road, New Plymouth 11 Figure 3 A & A George Family Trust cleanfill at Dudley Road, Inglewood 16 Figure 4 AE Riddick's cleanfill and sampling site at Carrington Road, New Plymouth 20 Figure 5 BJ & LB Bishop's cleanfill sand sampling sites at Ahu Ahu,