held by the companies in the Lower Waiwhakaiho area;
• the nature of the monitoring programme in place for the period under review; and
• a description of the activities and operations conducted in the Companies’ site/catchment.
Each company’s activity is then discussed in a separate section (Sections 2 to 7).
In the subsections for each company (e.g. Section 2.1) there is a general description of the industrial activity
and its discharges, an aerial photograph or map showing the
REGIONAL XPLORER
STDC, SDC and TRC collaborate to
provide regional geographic
information system (GIS) services
to the community via Taranaki
Regional Xplorer.
Regional Xplorer is a free web-
based mapping and local authority
information service. Users have
page
18
access to property information, infrastructure services, environmental services, planning
information and aerial photgraphy.
Benefits
Cost-savings from creating and maintaining a single system.
Figure 4 Location of sampling sites in relation to the Eltham
wastewater treatment system 20
page
iv
Figure 5 Aerial location map 21
Figure 6 Trend in MCI at the Mangawhero Stream site downstream
of the outfall (MWH000490) 28
Figure 7 Trend in MCI at the Mangawhero Stream site upstream of
the outfall (MWH000380) 28
List of photos
Photo 1 Overflow retention pond, 21 July 2011 8
Photo 2 Replacement aerator, June 2013 14
page
1
consent 43
4. Recommendations 44
Glossary of common terms and abbreviations 45
Bibliography and references 47
Appendix I Resource consents held by Trustpower Ltd in relation to the Patea HEPS 1
Appendix II Lake Rotorangi Hazard Maps 1
page
ii
List of tables
Table 1 Summary of breaches of flow rise and recession rates in the 2011-2014
period 17
Table 2 Summary of lake levels in relation to consent conditions 20
Table 3 Reports submitted to
TRC Guidelines for the Control of Drilling Wastes 50
Appendix IV Schrider Landfarm Results 545
Appendix V Maps of Landfarmed Sites 58
Appendix VI Spence Road Landfarm results 60
Appendix VII Agknowledge landfarm review report 63
page
iii
List of tables
Table 1 Summary of landfarming consents covered by this report 5
Table 2 Soil samples taken on 12 June 2013 at Geary Landfarm 12
Table 3 Origin supplied soil results from the Geary
site activity .................................................................................................................... 7
3.1 Site map .................................................................................................................................................... 7
3.2 Description of the site activity ................................................................................................................ 8
3.3 Composting operation
Trustpower Patea Hydroelectric Power Scheme consent monitoring report 2018-2019
3953-3 43
Table 16 Chemical analysis of samples taken in the vicinity of the Patea closed
landfill site 48
Table 17 Summary of performance for Patea closed landfill stormwater and
leachate consent 0427-3 49
Table 18 Summary of performance for Patea closed landfill air discharge
consent 4636-2 50
Table 19 Summary of performance for Patea closed landfill stormwater and
sediment consent 7268-1 51
List of figures
Figure 1 Regional map of STDC landfills 5
Figure 2 Eltham
which this simplified objective are referenced in a more nuanced manner
should be in the topic chapters (i.e., where and how “protected, restored,
improved and or sustained” is selected as the appropriate approach for a
given resource). This would be outlined in the relevant topic chapter’s
objectives, policies, rules and other methods (e.g., through the mapping of
sites and areas, and in assessment criteria). These aspects can be
addressed in detail in future hearings on
Table 26 Summary of performance for Taranaki Trucking Company
Limited’s cleanfill consent 5561-1 69
Table 27 Summary of performance for Taranaki Trucking Company
Limited’s culvert consent 6280-1 70
List of figures
Figure 1 Regional map showing the locations of the cleanfills
monitored under this programme during the year under
review 5
Figure 2 AA Contracting Limited’s cleanfill and sampling sites at
Henwood Road, New Plymouth 11
Figure 3 A & A George Family