Your search for 'iwi map' returned 2203 results.

Annual report 2016-2017

3.5 Alterations to monitoring programmes for 2017-2018 14 4 Recommendation 15 Glossary of common terms and abbreviations 16 Bibliography and references 17 Appendix I Resource consents held by STDC Patea Beach green waste discharge page ii List of tables Table 1 Summary of performance for consent 6088-3 13 List of figures Figure 1 Regional map showing the location of the Patea green waste site 4 Figure 2 Aerial view of the

Trees for the environment study unit

could include: • Investigate the use of forest and bush areas. • Draw a map of New Zealand and show where the regional and national parks and reserves are located. • Tourism and trees - write about it! • Explore conservation issues ... stating opinions and justifying them. • Look at logging history and the uses of wood in the past, present and future. • Find out about people who live in forests – today and in the past. • Follow the journey of a log and the energy

TRC Interim Technical Memorandum Nutrients NOF Baseline State September 2023

0.01545 A A A Northern Hill Country WMR000100 59 0.0092 0.015 59 0.0092 0.015 B A B Maps of the site-specific baseline attribute states for ammonia, nitrate, and DRP concentrations at each state of environment monitoring site are presented in Figure 1, Figure 2 and Figure 3, respectively. page Technical Memorandum | Draft Baseline State for Nutrients in Taranaki Rivers Figure 1: Site-based baseline states identified for median and 95th percentile ammonia

Fonterra Whareroa consent monitoring 2017-2018

COD in wastewater discharge, based on 24 hour time-proportioned composite samples 37 Figure 10 Map of sampling sites in relation to the outfall 42 Figure 11 Mean number of species per quadrat for spring surveys (1992-2018) 42 Figure 12 Mean Shannon-Weiner indices per quadrat for spring surveys (1992-2018) 42 Figure 13 Mean number of species per quadrat for summer surveys (1986-2018) 43 Figure 14 Mean Shannon-Weiner Indices per quadrat for summer surveys (1986-2018) 43

Annual report 2016-2017

practicable option to minimise adverse environmental effects. Condition 7 requires all works shall comply with noise standards. Condition 8 requires the consent holder to survey and map the position of the structures. Condition 9 requires the consent holder undertake pre and post-lay surveys of the pipeline corridor. page 9 Condition 10 states that the structure shall be removed and the area reinstated, if and when it is no longer required. Conditions 11 and 12 are

Biennial report 2011-2013

and into land via landfarming during the 2011-2012 monitoring year 24 Table 9 Summary of performance for Consent 5956-1 to discharge drilling wastes from hydrocarbon exploration and production activities, and oily wastes from wellsites, onto and into land via landfarming during the 2012-2013 monitoring year 26 List of figures Figure 1 Aerial photograph showing the layout of Waikaikai Landfarm and approximate regional location (inset) 6 Figure 2 Supplied spreading map