Your search for 'iwi map' returned 2244 results.

Annual report 2012-2013

Resource consent held by Malandra Downs Ltd 13 page ii List of tables Table 1 Summary of performance for Consent 7374-1 To discharge domestic green waste onto and into land for land stabilisation purposes and to discharge associated stormwater and leachate onto and into land 8 List of figures Figure 1 Regional map showing the location of the site 3 Figure 2 Aerial image of the property 4 page 1 1.

Appendix 3

page 77 6.3 Appendix III: Examples of Taranaki Coastal Reso urces, Aerial Plans, 1987 Note: These maps have been scanned for future digitalising of the lines and erosion rate information at a high resolution. Attached are examples only. 1. Tongaporutu (#650476) 2. Whitecliffs North (#650481) 3. Mimi (#650468) 4. Urenui (#658737) (not included here) 5. Onaero (#650473) (not included here) 6. Waitara East (#658739) (not included here) 7. Waitara

Intensive Winter Grazing Factsheet FAQs and useful links

measuring the slope over any 20 m distance of the land. The Councils will use a clinometer or a mobile phone app or tool. Councils may also have drones, aircraft and high-resolution digital elevation maps available in some areas. . MEASURING SLOPE Mea page Rule 26(4)(d), National Environmental Standards for Freshwater: livestock must be kept at least 5 m away from the bed of any river, lake, wetland, or drain (regardless of whether there is any water in it at

Schedule V: Sites of geological significance

page 175 CO AS TAL P L AN F O R TARANAK I S chedu le 5 – S i t e s o f geo l og i ca l s ign i f i c ance Schedule 5 – Sites of geological significance This schedule identifies sites identified in the Geological Society of New Zealand’s Inventory and Maps of Important Geological Sites and Landforms in the Taranaki and Wanganui Regions 1996. Sites locations are approximate only and are not intended to provide a definitive location or extent of a

STDC townships wastewater treatment consent monitoring 2018-2019

sites for Waverley WWTP 51 Table 31 Low flow receiving water results January 2019 52 Table 32 Summary of performance for consent 0072-3 54 Table 33 Summary of performance for consent 6621-1 55 page v List of figures Figure 1 Aerial location map of sampling sites in relation to Kaponga WWTP 13 Figure 2 Aerial location map of sampling sites in relation to Manaia WWTP 22 Figure 3 Map showing sampling sites in relation to Patea WWTP 36 Figure 4 E. coli

Consultation Document for Draft Annual Plan 2019/2020

page 10 More details on the most likely options Given the Council’s upper borrowing limit of $55m, the more realistic choices are Options 2, 3 or 4 if the region wants a fit-for-purpose Stadium. OPTION 2 (PREFERRED OPTION): REPAIR STANDS AND UPDATE FACILITIES What’s involved  Repairing and reinstating both main stands.  Relocating of gym and changing rooms to another building (bottom right corner on map above)  Reconfiguring/modernising East Stand ground …

Annual report 2013-2014

based muds), from hydrocarbon exploration and production activities, onto and into land via landfarming 25 List of figures Figure 1 Aerial photograph showing the location and approximate extent of the Symes Manawapou Landfarm and approximate regional location (inset) 7 Figure 2 Remediation (NZ) Limited supplied map showing previously spread and completed areas Stage 1 & 2, and the recently spread area Stage 3 which was spread in the 2013-2014 monitoring period 15 Figure

Land Transport Plan monitoring report 2019/2020

Iwi partnering, reviewing stormwater options, commencing geotechnical investigations. SH3 New Plymouth to Hāwera $1,970,000 was recently committed for design of proposed safety improvements from New Plymouth to Egmont Village including a rural roundabout at the Mangorei Road/SH3 intersection, an 8.65 km section of median barrier and intersection speed zones at Junction Street Further funding is needed to complete the construction of the proposed safety improvements. …

Waikaikai Landfarm consent monitoring 2019-2020

Map reference: E 1719720 (NZTM) N 5605515 Mean annual rainfall: 1,043 m Mean annual soil temperature: 15.1ºC Mean annual soil moisture: 32.9% Elevation: ~45 m Geomorphic position: Dune back slope Erosion / deposition: Erosion Vegetation: Pasture, dune grasses Parent material: Aeolian/alluvial deposits Drainage class: Free/well-draining 1.4 Resource consents The Company holds one resource consent, the details of which are summarised …

Air Quality

air quality with consistently low levels of nitrogen oxides (calculated one-hour average). See map below for SEM site locations. In 2012, the Council also monitored two industrial sites as part of consent compliance monitoring: Fonterra’s Whareroa dairy factory generation plant and Downer EDI’s asphalt and bitumen plant. Four samples were taken at each site. Results from this monitoring found that NOx concentrations at the Fonterra site were comparable with SEM monitoring sites