Resource consent held by Malandra Downs Ltd 13
page
ii
List of tables
Table 1 Summary of performance for Consent 7374-1 To discharge
domestic green waste onto and into land for land
stabilisation purposes and to discharge associated
stormwater and leachate onto and into land 8
List of figures
Figure 1 Regional map showing the location of the site 3
Figure 2 Aerial image of the property 4
page
1
1.
page
77
6.3 Appendix III: Examples of Taranaki Coastal Reso urces, Aerial
Plans, 1987
Note: These maps have been scanned for future digitalising of the lines and erosion rate
information at a high resolution. Attached are examples only.
1. Tongaporutu (#650476)
2. Whitecliffs North (#650481)
3. Mimi (#650468)
4. Urenui (#658737) (not included here)
5. Onaero (#650473) (not included here)
6. Waitara East (#658739) (not included here)
7. Waitara
measuring the slope over any 20 m distance of the land. The Councils will use a
clinometer or a mobile phone app or tool. Councils may also have drones, aircraft
and high-resolution digital elevation maps available in some areas.
.
MEASURING SLOPE
Mea
page
Rule 26(4)(d), National Environmental Standards for Freshwater: livestock must
be kept at least 5 m away from the bed of any river, lake, wetland, or drain
(regardless of whether there is any water in it at
page
175
CO AS TAL P L AN F O R TARANAK I S chedu le 5 – S i t e s o f geo l og i ca l s ign i f i c ance
Schedule 5 – Sites of geological significance
This schedule identifies sites identified in the Geological Society of New Zealand’s Inventory and Maps of Important Geological Sites and Landforms in the Taranaki and Wanganui Regions
1996. Sites locations are approximate only and are not intended to provide a definitive location or extent of a
sites for Waverley WWTP 51
Table 31 Low flow receiving water results January 2019 52
Table 32 Summary of performance for consent 0072-3 54
Table 33 Summary of performance for consent 6621-1 55
page
v
List of figures
Figure 1 Aerial location map of sampling sites in relation to Kaponga WWTP 13
Figure 2 Aerial location map of sampling sites in relation to Manaia WWTP 22
Figure 3 Map showing sampling sites in relation to Patea WWTP 36
Figure 4 E. coli
page
10
More details on the most likely options
Given the Council’s upper borrowing limit of $55m, the more realistic choices are Options 2, 3 or 4 if the region
wants a fit-for-purpose Stadium.
OPTION 2 (PREFERRED OPTION): REPAIR STANDS AND UPDATE FACILITIES
What’s involved
Repairing and reinstating both main stands.
Relocating of gym and changing rooms to another building (bottom right corner on map above)
Reconfiguring/modernising East Stand ground …
based muds), from hydrocarbon exploration and
production activities, onto and into land via landfarming 25
List of figures
Figure 1 Aerial photograph showing the location and approximate extent of the
Symes Manawapou Landfarm and approximate regional location (inset) 7
Figure 2 Remediation (NZ) Limited supplied map showing previously spread and
completed areas Stage 1 & 2, and the recently spread area Stage 3 which
was spread in the 2013-2014 monitoring period 15
Figure
Iwi partnering, reviewing stormwater options,
commencing geotechnical investigations.
SH3 New Plymouth to Hāwera
$1,970,000 was recently committed for design of proposed safety
improvements from New Plymouth to Egmont Village including a rural
roundabout at the Mangorei Road/SH3 intersection, an 8.65 km section
of median barrier and intersection speed zones at Junction Street
Further funding is needed to complete the construction of the proposed
safety improvements. …
Map reference: E 1719720
(NZTM) N 5605515
Mean annual rainfall: 1,043 m
Mean annual soil temperature: 15.1ºC
Mean annual soil moisture: 32.9%
Elevation: ~45 m
Geomorphic position: Dune back slope
Erosion / deposition: Erosion
Vegetation: Pasture, dune grasses
Parent material: Aeolian/alluvial deposits
Drainage class: Free/well-draining
1.4 Resource consents
The Company holds one resource consent, the details of which are summarised …
air quality with
consistently low levels of nitrogen oxides (calculated one-hour average). See map below for SEM site locations.
In 2012, the Council also monitored two industrial sites as part of consent compliance monitoring: Fonterra’s
Whareroa dairy factory generation plant and Downer EDI’s asphalt and bitumen plant. Four samples were
taken at each site.
Results from this monitoring found that NOx concentrations at the Fonterra site were comparable with SEM
monitoring sites