Your search for 'iwi map' returned 2244 results.

Waste Remediation Services Symes Manawapou LF Annual Report 2023 2024

2023/24 18 Figure 11 WRS provided map of landfarmed areas 23 List of photos Photo 1 WRS Symes Manawapou Landfarm post discharge and reinstatement pre-seeding 2014 4 Photo 2 WRS Symes Manawapou Landfarm post surrender sampling 2018 4 Photo 3 Landfarming area M2110 2021 (image provided by WRS) 5 Photo 4 Completed and grassed Area M2110 Stage II (May 2024) 21 Photo 5 Mud drying in spread area (left) and spreading liquids (right), Stage II/Phase 3 (2023/24) 26 page 1

Resource consents 22 January to 2 March 2021

4388 Review Dates: June 2027, June 2033 Activity Class: Controlled Location: Durham Road Upper, Inglewood Application Purpose: Replace To discharge washdown water from the cleaning of broiler chickensheds onto and into land Rohe: Te Atiawa (Statutory Acknowledgement) Engagement or consultation: Te Kotahitanga o Te Atiawa Trust Comment on application received  Generally consistent with Iwi Environmental Management Plan  Application lacks

PTL dredging consent monitoring 2016-2018

the consent. The trailer suction dredge, the Pelican (Photo 1), is equipped with GPS navigation systems and lateral thrusters, which allow precise positioning of the vessel (Atkinson et al., 2001). This navigation system also allows the vessel’s location to be measured continuously, producing a map of its track at all times. An example of the continual monitoring of the Pelican’s tracks is shown in Figure 3. Tracks of the vessel show where each dredged load came from, and into what area

Report 2014-2016

producing a map of its track at all times. An example of the continual monitoring of the Pelican’s tracks is shown in Figure 3. Tracks of the vessel page 6 show where each dredged load came from, and into what area it was dispersed within the spoil site (Figure 2). The vessel is a split hopper dredge with a hopper capacity of 965 m3. Once the vessel is full and on site ready to dispose the spoil, the entire hull opens in half where it pivots about its longitudinal

24Furtherinformation AppendixT

friendly work environment . To feel valued and appreciated . Opportunities for personal development Regulators . To meet the required laws and regulations . To maintain hiqh standards of corporate qovernance IWI . Exercise of Kaitiakitanga (guardianship and protection) for the Mimitangiatua River and Haehanga Stream. . To be kept informed about environmental performance . To have confidence in site management and the ability of Remediation NZ to avoid adverse environmental effects . To

Beach Energy Resources Kupe Production Station Annual Report 2023-2024

received December 2021 Yes 6. Best practicable option to prevent or minimise adverse effects No maintenance during period under review N/A 7. Disturbance to comply with noise standards No maintenance during period under review N/A 8. Survey and map of position of pipeline to be provided Provided by consent holder Yes 9. Consent holder to undertake pre and post lay monitoring surveys Surveys complete Yes 10. Structures to be removed and area reinstated if and when no longer

Remediation NZ Waitara Road Worm Farm Annual Report 2023-2024

page ii List of figures Figure 1 RNZ Waitara Road Facility map 3 Figure 2 Stormwater drainage on the site 4 Figure 3 Vegetated swale from the stormwater pond to the property boundary 4 Figure 4 Farm drain on the neighbouring property 5 page 1 Introduction Compliance monitoring programme reports and the Resource Management Act 1991 1.1.1 Introduction This report details and discusses the results and findings of the 2023/24 monitoring

Greymouth Petroleum Ltd Kowhai D Hydraulic Fracturing Annual Report 2023-2024

groundwater sampling carried out in relation to the Kowhai-D fracturing events 9 Table 6 Results of hydraulic fracturing fluid sampling 12 Table 7 Results of hydraulic fracturing return fluid sampling 12 Table 8 Summary of performance for Consent 10297-2 14 Table 9 Evaluation of environmental performance over time 15 List of figures Figure 1 Location map 4 page 1 Introduction Compliance monitoring programme reports and the Resource Management Act 1991 1.1.1

Message to Wellington 2017

Maori and the region as a whole. The next Government must continue to make the completion of Treaty settlements in Taranaki a priority. Good progress has been made on Treaty settlements with all bar one (of eight) iwi having now settled their Treaty claims. The remaining iwi (Ngati Maru) are currently in negotiations with the Crown. Claims relating to the Mounga are under negotiation. A reconciliation between the Crown and Parihaka has recently been completed (9 June 2017) and a