Your search for ''nvOpzp; AND 1=1 OR (<'">iKO)),' returned 5183 results.

Annual report 2014-2015

the results, their interpretations, and their significance for the environment. Section 4 presents recommendations to be implemented in the 2015-2016 monitoring year. A glossary of common abbreviations and scientific terms, and a bibliography, are presented at the end of the report. page 2 1.1.3 The Resource Management Act 1991 and monitoring The RMA primarily addresses environmental ‘effects’ which are defined as positive or adverse, temporary or permanent,

Annual report 2013-2014

the end of the report. 1.1.3 The Resource Management Act (1991) and monitoring The Resource Management Act 1991 (RMA) primarily addresses environmental `effects' which are defined as positive or adverse, temporary or permanent, past, present or future, or cumulative. Effects may arise in relation to: (a) the neighbourhood or the wider community around a discharger, and may include cultural and socio-economic effects; page 2 (b) physical effects on the

Report 2013-2014

and technical data. Section 3 discusses the results, their interpretations, and their significance for the environment. Section 4 presents recommendations to be implemented in the 2014-2015 monitoring year. A glossary of common abbreviations and scientific terms, and a bibliography, are presented at the end of the report. 1.1.3 The Resource Management Act (1991) and monitoring The RMA primarily addresses environmental ‘effects’ which are defined as positive or adverse,

Greymouth Petroleum deep well injection consent monitoring 2017-2018

There is no evidence of any issues with any injection well currently in use, or the on-going ability of the receiving formation to accept injected fluids. The results of groundwater quality monitoring undertaken show no adverse effects of the activity at monitored locations. Inspections undertaken during the monitoring year found sites being operated in a professional manner and there were no Unauthorised Incidents in relation to any of the Company’s DWI consents. During the year, the

Annual report 2016-2017

of any issues with any injection well currently in use, or the on-going ability of the receiving formation to accept injected fluids. The results of groundwater quality monitoring undertaken show no adverse effects of the activity at monitored locations. Inspections undertaken during the monitoring year found sites being operated in a professional manner and there were no Unauthorised Incidents in relation to any of the Company’s DWI consents. During the year, the Company demonstrated a

Annual report 2013-2014

mouth in order to reduce erosion of the banks. During the year, the Wai-iti Motor Camp Limited demonstrated a high level of environmental performance and compliance with the resource consents. During the year under review there were no unauthorised incidents reported in relation to the motor camp. No adverse environmental effects were observed as a result of the Wai-iti Beach Motor Camp Limited wastewater system or rock revetment structure. This report includes recommendations for the

Annual report 2014-2015

the unnamed tributary of the Mangaone Stream. The results from deposition gauging indicate that there was an environmentally acceptable level of particulate deposition in the vicinity of the foundry site. No visible emissions or odour issues were noted during inspections and no complaints were received during the period under review. During the year, McKechnie Aluminium Solutions Ltd demonstrated a high level of environmental performance and a high level of administrative compliance with

Annual report 2012-2013

discusses the results, their interpretations, and their significance for the environment. Section 4 presents recommendations to be implemented in the 2013-2014 monitoring year. A glossary of common abbreviations and scientific terms, and a bibliography, are presented at the end of the report. page 2 1.1.3 The Resource Management Act (1991) and monitoring The Resource Management Act primarily addresses environmental ‘effects’ which are defined as positive or

Remediation NZ Ltd consent monitoring 2017-2018

Significant riparian work and associated fencing had been undertaken during this period, with more planned in the upcoming monitoring period. A new culvert was installed in the centre of site to give the Company more operating space, lessen the potential for flooding and to make sure no sawdust or waste spill over. A new irrigation area was completed this monitoring period and additional groundwater monitoring bores (4) were installed by the consent holder. Administration requires additional

Council meeting minutes September 2020

Leden/MacLeod 10. Public Excluded In accordance with section 48(1) of the Local Government Official Information and Meetings Act 1987, resolves that the public is excluded from the following part of the proceedings of the Ordinary Meeting on Tuesday 22 September 2020 for the following reason/s: Item 11 - Public Excluded Ordinary Minutes – 11 August 2020 THAT the public conduct of the whole or the relevant part of the proceedings of the meeting would be likely to result in the …