Your search for ''nvOpzp; AND 1=1 OR (<'">iKO)),' returned 5325 results.

Annual report 2013-2014

supplied by the Company have been used in compiling this report. The Council did not receive any complaints or register any unauthorised incidents associated with any of the Company’s DWI activities during the 2013-2014 monitoring period. During the year, the Company demonstrated a high level of environmental and administrative performance with the resource consents. For reference, in the 2013-2014 year, 60% of consent holders in Taranaki monitored through tailored compliance monitoring

RKM Farms monitoring report 2017-2018

terms, and a bibliography, are presented at the end of the report. 1.1.3 The Resource Management Act 1991 and monitoring The RMA primarily addresses environmental ‘effects’ which are defined as positive or adverse, temporary or permanent, past, present or future, or cumulative. Effects may arise in relation to: a. the neighbourhood or the wider community around an activity, and may include cultural and social- economic effects; b. physical effects on the locality, including landscape,

Annual report 2016-2017

abbreviations and scientific terms, and a bibliography, are presented at the end of the report. 1.1.3 The Resource Management Act 1991 and monitoring The RMA primarily addresses environmental ‘effects’ which are defined as positive or adverse, temporary or permanent, past, present or future, or cumulative. Effects may arise in relation to: a. the neighbourhood or the wider community around an activity, and may include cultural and social- economic effects; b. physical effects on the locality,

Annual report 2014-2015

conditions setting out the requirements that they must satisfy. Fonterra holds four consents to allow it to take and use water and for associated structures, eight consents to discharge stormwater, sediment, and back flushing from sand filters (and their associated structures) into the unnamed tributaries of the Tangahoe, Tawhiti and an unnamed coastal stream, or to land where it may enter water, six consents to discharge wastewater to the Tasman Sea along with associated structures, two consents

Annual report 2015-2016

during the period under review. Both incidents were considered to be unforeseeable and related to mechanical failures or unanticipated issues at the site. In addition both events were adequately mitigated or remedied by Methanex after they occurred. For this reason no enforcement response was considered appropriate or necessary. During the year, Methanex demonstrated a High level of environmental performance with the resource consents at both facilities. Their administrational performance has

Annual report 2013-2014

1.1.3 The Resource Management Act (1991) and monitoring The RMA primarily addresses environmental ‘effects’ which are defined as positive or adverse, temporary or permanent, past, present or future, or cumulative. Effects may arise in relation to: (a) the neighbourhood or the wider community around a discharger, and may include cultural and social-economic effects; (b) physical effects on the locality, including landscape, amenity and visual effects; (c) ecosystems, including

Annual Report 2014/2015 - full document

page 3 CHAIRMAN AND CHIEF EXECUTIVE’S REPORT Working with people|caring for Taranaki Smith, in early July 2015. The report shows great progress is being made. Importantly, trends in both the ecological health and the physical and chemical state of the region’s waterways are the best ever recorded, and the region’s land, air and coast are also in good or excellent shape. Another important project has been the continuing review of the current Freshwater and Soil Plans,

Pest Control Guidelines Northland 2015 - NZ Landcare Trust

presents basic information on common animal pests, and provides practical guidelines on how to use a range of traps, toxins and techniques for maximum success. Some pests are intelligent enough to learn from bad experiences and will quickly discover how to avoid poisons, traps and spot lights if your first attempts to kill them are not successful. Using a range of traps, baits and techniques and cycling toxins from one knockdown to the next, helps to avoid a build-up of wise, bait or trap

Annual report 2013-2014

inspections, two discharge samples, 11 receiving water samples , two biomonitoring surveys of receiving waters, and four ambient air quality analyses. No monitoring was scheduled or required at the Marfell or Okoki landfill sites during the year under review. During the monitoring year there were no incidents logged by Council associated with NPDC’s landfills covered in this report. Overall, NPDC demonstrated a high level of environmental performance and compliance with their resource consents.

Report 2013-2014

according to on site best practice, the discharge was therefore unlikely to have had any significant or on-going adverse effect on the receiving environment. Shell Todd Oil Services Ltd notified the Council of its intention to combust gas intermittently between 16 November 2013 and 20 December 2013. No offensive or objectionable odours, smoke or dust associated with activities at the wellsite were observed. The drilling fluids and cuttings were disposed of at a consented off site facility.