and TPJ all demonstrated an overall high level of environmental
performance.
During the period under review George Family demonstrated an overall good level of environmental
performance.
During the year, an improvement was required in Graham Harris’s level of environmental
performance.
The Council's monitoring programme included 38 inspections, with each site receiving either two or three
scheduled inspections. The Council collected 14 water samples for physicochemical analysis
from the irrigation areas were 3563 kg N/yr, or 992 kg N/ha/yr. (Based on 2019 irrigation areas).
2.2 Project Scope
The scope of this report is confined to;
• The areas on the Uruti site which include the Irrigation pond and the two irrigation areas, and;
• The compost located on Pads 1 & 3 which is suitable to be spread onto the irrigations areas as a soil
conditioner and fertiliser.
The report is prepared on the basis that drilling mud deliveries cease on 31 December 2020. The
Section 4 presents recommendations to be implemented in the 2019-2020 monitoring year.
A glossary of common abbreviations and scientific terms, and a bibliography, are presented at the end of
the report.
1.1.3 The Resource Management Act 1991 and monitoring
The RMA primarily addresses environmental ‘effects’ which are defined as positive or adverse, temporary or
permanent, past, present or future, or cumulative. Effects may arise in relation to:
a. The neighbourhood or the wider
and TPJ all demonstrated an overall high level of environmental performance.
George Family demonstrated an overall good level of environmental performance.
An improvement is required in Graham Harris’ environmental performance.
The Council's monitoring programme included 33 inspections, with each site receiving either two or three
scheduled inspections. Council also took 13 water samples for physicochemical analysis during the 2016-
2017 year.
No adverse environmental effects were
required to renew seven of the eight consents. This AEE document
supports the applications for the renewal of these consents.
No new works are being proposed. The effects of the activity will remain the same or similar
as they are currently.
There are no significant changes proposed to the operation of the hydroelectric scheme. No
new equipment is proposed in the near future, and it is expected that the scheme will continue
largely in its current form.
2. THE OPUNAKE POWER STATION – A
discharged into a nearby farm drain and surface water. An abatement notice and infringement fine were
issued. The abatement notice was immediately complied with. The second exercise was undertaken without
issue.
Spreading procedures were updated to prevent stockpiling of waste on paddocks prior to spreading or
landfarming.
Water treatment sludge remains lagooned in-situ at two locations on the consent holder’s property.
By comparison with previous monitoring periods, the monitoring
statutory acknowledgement are—
(d) to require consent authorities, the Environment Court, or the Historic Places Trust to have regard to the
statutory acknowledgements in relation to Part of Mimi-Pukearuhe Coast Marginal Strip as provided for in
sections 50 to 52; and
(e) to require relevant consent authorities to forward summaries of resource consent applications to the
trustees, as provided for in section 54; and
(f) to enable the trustees and a member of Ngāti Mutunga to cite the
The Resource Management Act (1991) and monitoring 1.2.1
The Resource Management Act 1991 (RMA ) primarily addresses environmental
`effects' which are defined as positive or adverse, temporary or permanent, past,
present or future, or cumulative. Effects may arise in relation to:
page
2
(a) the neighbourhood or the wider community around a discharger, and may
include cultural and socio-economic effects;
(b) physical effects on the locality, including landscape,
page
Coastal Management Area B : Estuaries
page
2 2
2
Structures
Activity Rule Standards/Terms/Conditions Classification Notification Control/Discretion Policy References
Alteration, reconstruction or
removal and re-placement of
an existing structure for
maintenance
B1.1 • Activity is for the purpose of maintaining the structure in good repair;
• Size of the structure will not increase beyond original size;
• Sediment disturbance
provided
R2/10835-1.0 Commencement Date: 22 Jul 2020
Summerset Villages (Bell Block) Limited Expiry Date:
PO Box 5187, Wellington 6140 Review Dates: Jun 2026 and 6-yearly
thereafter
Activity Class: Discretionary
Location: 56 Pohutukawa Place, Bell Block Application Purpose: New
To drill and construct a bore
Rohe:
Te Atiawa (Statutory Acknowledgement)
Engagement or consultation:
Te Kotahitanga o Te Atiawa Trust Comment on …