Your search for ''nvOpzp; AND 1=1 OR (<'">iKO)),' returned 5168 results.

Pest Management Plan decisions report

where toxic and ecotoxic substances must be used, that there are buffer zones of 200 metres for any waterways or Ngāruahine statutory areas. The Council notes the submitter’s concerns regarding increased use of toxins but notes that both initial and ongoing mustelid control are based upon a (non-toxic trap) network. Iwi participation 5. Amend No change required The submitter seeks that Ngāruahine iwi and hapū members participating in current and future pest control and

Value Timber monitoring report 2019-2020

the large pre-fill gully was maintained as were the silt controls. There were no discharges of unauthorised wood waste or other materials found at inspection. There were no unauthorised incidents recording non- compliance in respect of this consent holder during the period under review. During the year, the Company demonstrated a high level of environmental and administrative performance with the resource consent. For reference, in the 2019-2020 year, consent holders were found to …

Southern quarries monitoring 2018-2020

evaluated, including: a. A summary of the company’s performance, regarding the site and wider environment. b. If necessary, any incidents, investigations or interventions that occurred during the monitoring period. c. A direct assessment of the company’s consent compliance over the monitoring period. 5. Any alterations or recommendations for subsequent monitoring are stipulated. 6. If there are any provisions for consent review, these will be considered. The following resources are …

NP wastewater plant monitoring 2019-2020

environment. Section 4 presents recommendations to be implemented in the 2020-2021 monitoring year. A glossary of common abbreviations and scientific terms, and a bibliography, are presented at the end of the report. 1.1.3 The Resource Management Act 1991 and monitoring The RMA primarily addresses environmental ‘effects’ which are defined as positive or adverse, temporary or permanent, past, present or future, or cumulative. Effects may arise in relation to: a. the neighbourhood or the …

Resource consents 2 October - 5 November 2020

Purpose: Extension of Lapse To discharge contaminants to air from hydrocarbon exploration at the Turangi-D wellsite, including combustion involving flaring or incineration of petroleum recovered from natural deposits, in association with well development or redevelopment and testing or enhancement of well production flows Rohe: Ngati Mutunga Te Atiawa (Statutory Acknowledgement) Engagement or consultation: Te Kotahitanga o Te Atiawa Trust Comment on application …

Cheal production station monitoring 2019-2020

gases, PM10 particulates, and nitrogen oxides were all below levels of concern at the time of sampling. No offensive or objectionable odours were detected beyond the boundary during inspections. During the year, the Company demonstrated a high level of both environmental performance and administrative compliance with the resource consents. For reference, in the 2019-2020 year, consent holders were found to achieve a high level of environmental performance and compliance for 81% of the …

McKee Power Plant monitoring 2019-2020

end of the report. 1.1.3 The Resource Management Act 1991 and monitoring The RMA primarily addresses environmental ‘effects’ which are defined as positive or adverse, temporary or permanent, past, present or future, or cumulative. Effects may arise in relation to: a. the neighbourhood or the wider community around an activity, and may include cultural and social-economic effects; b. physical effects on the locality, including landscape, amenity and visual effects; c. ecosystems, …

Support Pukeiti

page Your gift will be acknowledged digitally, in the Lodge on a tablet, along with all other benefactors. Details of your gift can include information of up to 150 words about the donor and their relationship to Pukeiti. Seats include a plaque (125 x 40mm) with a maximum of 80 characters. Regional Council Taranaki Support Pukeiti To donate to any of these projects, or to make a general donation, please download the Support Pukeiti application form

Tawhiti Catchment monitoring report 2019-2020

1 Activities of resource consents that are not covered by the Tawhiti Stream Resource Consents Monitoring Programme, for Fonterra Whareroa Dairy Factory and South Taranaki District Council Hawera Landfill, are included in other monitoring programmes carried out by the Council. page 2 1.1.3 The Resource Management Act (1991) and monitoring The RMA primarily addresses environmental ‘effects’ which are defined as positive or adverse, temporary or permanent, past, present or

Remediation hearing - applicant's evidence - expert evidence (economic)

area of expertise and I have not omitted to consider material facts known to me that might alter or detract from the opinions expressed. PURPOSE 10. I have been retained by Remediation NZ Limited to prepare a statement of evidence on relating to its application to renew consents to enable the operation of its waste treatment and recycling facility at Uruti in northern Taranaki. 11. For this, I have examined the role of the Remediation NZ plant in the Taranaki