Remediation NZ Waitara Road Worm Farm Annual Report 2023-2024

the Company’s activities. During the 2023/24 monitoring period Remediation NZ Ltd demonstrated a high level of environmental performance, and a good level of administrative performance. The Council’s monitoring programme for the year under review included two inspections which found the Company was operating in accordance with the consent conditions. Several areas for improvement which had been identified during the previous year had been, or were in the process, of being addressed. The

McKechnie Aluminium Solutions Ltd Annual Report 2023-2024

during the period under review support the trend of reductions in the levels of contaminants in the receiving water at Sanger’s Intake seen during recent years. No samples outside of the mixing zone exceeded the relevant USEPA receiving water criteria for the protection of aquatic ecosystems for zinc or copper, and all other parameters were below levels stipulated by consent conditions. Biomonitoring results indicated that treated stormwater discharged from the site was not having a

AN014 Lake Rotorangi SoE Annual Report 2021-2024

produced a lower TLI score corresponding to the middle of the mesotrophic range (indicative of fair water quality). Historically, the TLI for Lake Rotorangi has tended to sit very close to the mesotrophic- eutrophic threshold. Based on the attributes set out in the National Policy Statement for Freshwater Management (2020), ammonia and E. coli concentrations classify the lake in the ‘A’ band, or minimally impacted compared to reference conditions. Total nitrogen concentrations classify the

Report and decision on use of water from the Waitotara River for pasture irrigation (2010)

Council staff (observers) and members of the public, affiliated with Federated Farmers or Te Kaahui o Rauru. page page 1 Description of Proposed Activity 1. The applications by Pukeone Partnership [Pukeone] and Kereone Farms Ltd [Kereone] [‘the applicants’] are to take water from the Waitotara River for pasture irrigation. The applications are to take through separate, independent pumping systems at the same site, which is about 5 km upstream of the

Form B – Land Use & Discharge consent application form for farming activities (Jan 2025)

Please indicate the type and number of land use/discharge consents you are applying for on this form Type Number of applications Previous consent number (if replacement or change)  Stockholding Land use Please note a deposit will be required for each consent applied for. This total should match the number of consents and deposit amount you have completed in Section 9 (Fees and charges) of Form A. Discharge  Feedlot Land use Discharge 

Application Appendix D Natural Character Landscape and Visual Assessment 20 02053 4 0 + 5 other renewals Trustpower 25 Nov 2020

without independent verification, unless otherwise indicated. No liability or responsibility is accepted by Boffa Miskell Limited for any errors or omissions to the extent that they arise from inaccurate information provided by the Client or any external source. Template revision: 20180621 000020180621 0000 File ref: A18287_Mangorei_HEPS_NCLVA_Final_November_2020.docx LEGALLY PRIVILEGED AND PREPARED FOR CHANCERYGREEN page LEGALLY PRIVILEGED AND PREPARED FOR CHANCERYGREEN

NZ Energy Corporation Waihapa Production Station Annual Report 2023-2024

of expected background levels. There were no significant odour or dust effects observed during inspections and no air quality complaints were received. For reference, in the 2023/24 year consent holders were found to achieve a high level of environmental performance and compliance for 864 (89%) of the 967 consents monitored through the Taranaki tailored monitoring programmes, while for another 75 (8%) of the consents a good level of environmental performance and compliance was achieved.

Application Appendix H Fish Passage and Fish Screening Assessment 20 02053 4 0 + 5 other renewals Trustpower 25 Nov 2020

1.1 Background Trustpower has commenced a reconsenting process for the Mangorei Hydro-Electric Power Scheme (the scheme or HEPS) in Taranaki. Currently, information is being gathered to assess potential effects of the scheme on (among other things) aquatic ecology and water quality. Part of this process includes an assessment of the scheme on fish entrainment and fish screening, which is the focus of this report. This report does not address whether it is practicable to retrofit the HEPS with

Your Connector - Hāwera to NPGHS and SHGC - Oct 2023

page ŌKATO 0 10 km Scale INGLEWOOD ELTHAM STRATFORD MIDHIRST TARIKI NORMANBY ŌPUNAKE HĀWERA WAITARA BELL BLOCK O KURAĀ NEW PLYMOUTH NORFOLK NGAERE URENUI 1 2 3 4 3 45 3A 3 your connector Monday to Friday HĀWERA TO NPGHS & SHGC Bee Card Fares $2Single zone $3Cash Single zone Per extra zone $1 Fare Zones SCAN FOR FARE AND CONCESSION INFORMATION BUS STOP LOCATION Hāwera

Application form Part C Natural Inland Wetlands Information

ecosystem health, indigenous biodiversity, or hydrological functioning. Wetland maintenance means activities (such as weed control) which prevent the deterioration, or preserve the existing state, of a wetland’s ecosystem health, indigenous biodiversity or hydrological functioning. Biosecurity means activities to eliminate or manage pests and unwanted organisms (as those terms are defined in the Biosecurity Act 1993). page 01/25- Doc # TRCID-1750395856-212 Page 2 of 7