assigns them a rating for their environmental and administrative performance during the period
under review.
Environmental performance is concerned with actual or likely effects on the receiving environment from the
activities during the monitoring year. Administrative performance is concerned with the Company’s
approach to demonstrating consent compliance in site operations and management including the timely
provision of information to Council (such as contingency plans and water take data) …
few non-members came and we
anticipate these numbers will increase
now the events have been added to the
TRC calendar of garden events sent out
with the rates demands. Please
encourage friends and families to come
along on these walks.
Our next event is scheduled for Sunday
16 May, with Andrew Brooker, Pukeiti’s
Collections Officer, taking a walk
showing us weird and wonderful things
about Pukeiti’s rhododendrons. Those
attending are bound to be entertained
by Andrew as they
years to fund the repairs/reinstatement. Changes to the
rating for Yarrow Stadium to make it more transparent and to separate it from other
activities and functions with single purpose Yarrow Stadium targeted rates.
A proposed 0% change to general rates against a planned increase of 3.7% for 2019/2020
that was projected in the 2018/2028 Long-Term Plan
The Council’s planned commitments in respect of all of its other core activities remain
unchanged from those commitments identified
physicochemical analysis and three biomonitoring surveys of receiving waters. In
addition, monthly emission results and abstraction records were provided to the Council which were
reviewed.
The monitoring showed that the Stratford Power Station continued to be well managed with negligible
environmental effects as a process of the exercise of their consents.
Surface water abstraction was compliant with daily rate and volume. Process water discharges were
compliant with consent defined …
1.1.4 Evaluation of environmental and administrative performance
Besides discussing the various details of the performance and extent of compliance by the Company, this
report also assigns a rating as to each Company’s environmental and administrative performance during the
period under review. The rating categories are high, good, improvement required and poor for both
environmental and administrative performance. The interpretations for these ratings are found in Appendix
II.
For
List of tables
Table 1 Summary of consents held by the Company for the Motukawa HEP scheme 5
Table 2 Gauging results for gaugings undertaken in relation to the Manganui River residual flow 12
Table 3 Details of consents and special conditions in relation to abstraction rates, discharge rates and
water levels and the recording 13
Table 4 Summary of summer Manganui River daily water temperatures (°C) prior to the increase in
residual flow to 400 L/s (1992-2002) and for the years since,
discussing the various details of the performance and extent of compliance by CCCWSL, this report
also assigns them a rating for their environmental and administrative performance during the period under
review.
Environmental performance is concerned with actual or likely effects on the receiving environment from the
activities during the monitoring year. Administrative performance is concerned with CCCWSL’s approach to
demonstrating consent compliance in site operations and management including …
................................................................................................... 2
2.2 Emission measurements: Flare zone ..................................................................... 3
2.3 Emission Measurements: Evaporation zone ...................................................... 4
2.4 Mass Emission Rates used in the Dispersion Model ......................................... 4
2.4.1 Combustion equations with STNZ results .................................................... 6
2.4.2 Emission factors
Waste Management
Committee meeting held on Thursday 25 May 2016
2. receives the unconfirmed minutes of the Yarrow Stadium Joint Committee meeting
held on Monday 12 June 2017
3. receives the unconfirmed minutes of the Taranaki Civil Defence Emergency
Management Group meeting held on Tuesday 20 June 2017.
Cloke/Williamson
Ordinary Meeting - Confirmation of Minutes
6
page
Minutes Ordinary Meeting 27 June 2017
7. Setting of rates 2017/2018
7.1