Your search for 'rates' returned 2332 results.

Yarrow Stadium Asset Management Plan 2015

Park, New Plymouth for recreation, sporting and cultural activities to the advantage of all citizens of the Taranaki region. The stadium’s initial regional funding of $9.6 million was covered by a combination of uniform charges across the region and targeted rates in New Plymouth and North Taranaki. This arrangement ran from July 2001 to June 2012. In 2002 a major redevelopment saw two new grandstands added, the TSB Stand overlooking the main field’s eastern sideline and the Noel and

Submission from Papa Rererangi I Puketapu Ltd NP Airport 04 March 2022

air traffic control and navigational aids, refuelling services and significant areas of land and buildings to serve commercial tenants. All of these facilities are situated on land at the Airport designated within the District Plan. Average annual passenger growth rate is anticipated to be 5% per annum and in the period from 2018 to 2038 air passenger volume through New Plymouth is expected to grow from 430,000 to 1,200,0001. A new terminal building is currently under

Agenda

Lake Rotorangi is determined each year, through four water quality monitoring surveys and through phytoplankton surveys (conducted simultaneously with the water quality surveys). A previous benthic invertebrate survey and a three-yearly macrophyte (aquatic weeds) survey conducted in autumn 2015 are also reported, for completeness. Based on these surveys and studies, the lake’s condition continues to be classified as mesotrophic, with a very slow and insignificant rate of increase in trophic

Annual report 2015-2016

consent to discharge emissions into the air at the plant site. The consent to emit to air was replaced in May 2016. During the monitoring period, ANZCO demonstrated a generally good level of environmental performance. Monitoring is carried out by both ANZCO and the Council. ANZCO monitors water abstraction rate, effluent flow rate and composition, receiving water quality, odour at the plant boundaries, and effluent loadings, soil, and herbage for irrigation areas. The Council undertakes

Douglas fir

pruning is not practised to produce framing timber because Douglas-fir has many small branches and pruning costs are twice as much per tree as radiata Douglas-fir (Pseudotsuga menziesii) 8 Fifty-five year old stand of Douglas-fir page pine. If trees are pruned to produce clear-wood, a crown height of 5-6 metres should be left. Current silviculture regimes aim to produce high strength timber over a 45 year rotation using initial stocking rates of 1500-1600stems per hectare (sph).

Annual report 2016-2017

administrational performance has been rated as Good, as although the performance against most consent conditions with respect to the administrative compliance was high, issues around testing of the integrity of the water take pipeline and meeting the requirements of the Resource Management (Measurement and Reporting of Water Takes) Regulations 2010 are yet to be resolved. Methanex have been open and participative in their communication with regard to their progress on these issues. For reference, in

Urban rat trapping New Plymouth

may be required to neutralise this risk. The specific measures required will depend on the circumstances. page - 5 - 3 Methods A questionnaire was developed to elicit people’s involvement with reducing rat numbers, and their involvement with, and attitude towards trapping rats. Involvement was measured using a condensed version of the Laurent and Kapferer (1985) involvement scale developed by Kaine (2019) with respondents rating two statements on

14Furtherinformation AppendixJ

review can be summarised by the following main points:  Surface soils across the site are dominated by semi-porous silty clay-loams, overlying more impervious clay soils  Soils below 2000 mm have not been characterised  Chloride concentrations in the soil beneath the irrigation zone are highly elevated compared to non-irrigated areas  The shallow groundwater table is in direct connection with semi-porous loamy silty-clay  Due to high rates of irrigation loading, shallow

Trustpower Mangorei consent monitoring 2019-2020

rating as to each Company’s environmental and administrative performance during the period under review. Environmental performance is concerned with actual or likely effects on the receiving environment from the activities during the monitoring year. Administrative performance is concerned with the Company’s approach to demonstrating consent compliance in site operations and management including the timely provision of information to Council (such as contingency plans and water take data) in …

Triennial report 2010-2013

to the Council on a monthly basis. The raw water abstraction rate from the Waitara River for the Motunui plant was measured continuously and the plant effluent was monitored for a number of parameters with frequencies ranging from continuously (flow and pH) to monthly (trace metals). Abstraction of raw water from the Waitara River and effluent discharges at the Waitara Valley plant occurred sporadically during the monitoring period, and records were provided when this occurred. Monthly