Your search for 'rates' returned 2331 results.

Ballance Agri Nutrients Kapuni Ltd Annual Report 2021-2022

Inspections 16 2.2.2 Discharge monitoring 17 2.2.2.1 Effluent volume 17 2.2.2.2 Nitrogen application rates 17 2.2.3 Soil and herbage monitoring 18 2.2.3.1 Spring 2022 soil and herbage survey 19 2.2.3.2 Autumn 2022 deep soil leaching profiles 19 2.2.4 Groundwater monitoring 19 2.2.4.1 Electromagnetic induction survey 19 2.2.4.2 Groundwater monitoring in relation to effluent irrigation 20 2.2.4.3 Groundwater monitoring in relation to the FECB ammonia plume 22

Lower Waiwhakaiho Air Discharges Annual Report 2021-2022

development of the region’s resources. Evaluation of environmental performance Besides discussing the various details of the performance and extent of compliance by the consent holders, this report also assigns a rating as to each Company’s environmental and administrative performance during the period under review. The rating categories are high, good, improvement required and poor for both environmental and administrative performance. The interpretations for these ratings are found in

Northern Quarries Biennial Report 2020-2022

administrative compliance Besides discussing the various details of the performance and extent of compliance by the consent holders, this report also assigns a rating as to each Company’s environmental and administrative performance during the period under review. The rating categories are high, good, improvement required and poor for both environmental and administrative performance. The interpretations for these ratings are found in Appendix II. For reference, in the 2020-2021 year, consent

Taranaki Solid Waste Management Committee Minutes May 2022

opposed to rates directly. Currently the Litter Act and the Waste Minimisation Act are under review, that review will look at giving more power to Councils which then provides an opportunity to reassess programme funding. 3.3 Ms J Dearden, New Plymouth District Council, provided an update on the Agrecovery ‘One stop shop events’ advised that there was regional funding to hold more events in future however, an alternative provider would be involved due to unforeseen circumstance

Application form 20 02056 4 0 Trustpower 25 Nov 2020

applications relating to the continued operation and maintenance of the Mangorei HEPS. Is a structure on, under, or over a river bed required? No What is the maximum rate of taking proposed (litres/second)? 10000 What is the maximum rate of taking proposed (cubic metres per day)? 864000 What is the maximum volume proposed to be taken in a 7- day period (m3)? 6048000 Please indicate below how your taking will vary through a typical year Maximum or near to

NPDC Water Supplies Annual Report 2021-2022

the consent holders, this report also assigns a rating as to each Company’s environmental and administrative performance during the period under review. The rating categories are high, good, improvement required and poor for both environmental and administrative performance. The interpretations for these ratings are found in Appendix II. For reference, in the 2021-2022 year, consent holders were found to achieve a high level of environmental performance and compliance for 88% of the

Annual Plan 2022/2023

their resilience too, and as a region, we’ll continue to rise to the challenge. page 4 The bottom line The changing environment has impacted our budget with spending now forecast to be $46.8m (compared with $45.2m signalled in the 2021/2031 Long-Term Plan). As a result, general rates will move from the proposed 5.5% to 7.9% for 2022/2023, which for most ratepayers will be less than $20 per annum extra. Targeted rates remain consistent with those

Application form 21 03371 3 0 Trustpower Limited 26 Nov 2021

maintenance of the Motukawa HEPS. Is a structure on, under, or over a river bed required? No What is the maximum rate of taking proposed (litres/second)? 8000 What is the maximum rate of taking proposed (cubic metres per day)? 345600 What is the maximum volume proposed to be taken in a 7-day period (m3)? 2419200 Please indicate below how your taking will vary through a typical year Maximum or near to maximum:  Jul  May  Jun Less than

Application form 20 02053 4 0 Trustpower 25 Nov 2020

of water take are provided in the attached Assessment of Environmental Effects. This application is being made concurrently with six other applications relating to the continued operation and maintenance of the Mangorei HEPS. Is a structure on, under, or over a river bed required? Yes If a structure on, under, or over a river bed is needed please attach sketch plan of the structure including dimensions in the "Documents" step. What is the maximum rate of taking proposed