operational cost of Yarrow
Stadium is met by NPDC through rates funding. Over time growing utilisation
at Yarrow Stadium is projected to increase revenue, and while in some cases
increased event hosting will result in increased cost, reducing the operation
subsidy needed from the ratepayer is the goal.
Strategies through which this will be
achieved include:
• Develop a comprehensive business plan.
• Increase opportunities for commercial signage revenue and naming rights,
operational cost of Yarrow
Stadium is met by NPDC through rates funding. Over time growing utilisation
at Yarrow Stadium is projected to increase revenue, and while in some cases
increased event hosting will result in increased cost, reducing the operation
subsidy needed from the ratepayer is the goal.
Strategies through which this will be
achieved include:
• Develop a comprehensive business plan.
• Increase opportunities for commercial signage revenue and naming rights,
disposed of at the Colson
Rd landfill in 2009 and 2010 was over 61,000
tonnes per year which seems a lot and indeed
it is, but to many of us that amount is hard to
visualize. When we equate it to a per person
basis, it is 584 kilograms each. When we
compare that figure to the rate per person in
New Zealand of 790 kilograms per person we
are doing pretty well. It is expected that these
figures will decrease in the future through
waste minimisation initiatives. This landfill
closer to achieving sustainable development of
the region’s resources.
1.1.4 Evaluation of environmental performance
Besides discussing the various details of the performance and extent of compliance by the consent holder/s
during the period under review, this report also assigns a rating as to each consent holder’s environmental
and administrative performance.
Environmental performance is concerned with actual or likely effects on the receiving environment from the
activities during
has been shown to provide reasonably accurate
representation of inland inundation from tsunami based waves. The application is as
follows:
For a given shoreline wave height, the wave height was added to a mid tide value (in
this case 2 m), then the following attenuation rules were applied:
The potential runup height attenuates at a rate of 1 m for every 200 m
horizontal inland for flow direct from the coast.
page
Taranaki Tsunami Inundation Analysis
observations of the experts. Importantly, there are fundamental changes
proposed to the poultry farm operations, which will reduce the impacts of the air
discharges applied for in this Application, including2:
(a) the discharge consent is sought for a free-range broiler operation with a
reduced stocked rate of a maximum of 15 birds per square metre (61, 020
birds);
(b) roof fans with misting devices will be installed on the roof of the existing
sheds (and will be at least 100m from the
also assigns a rating as to each Company’s environmental and administrative performance during
the period under review.
Environmental performance is concerned with actual or likely effects on the receiving environment from the
activities during the monitoring year. Administrative performance is concerned with the Company’s
approach to demonstrating consent compliance in site operations and management including the timely
provision of information to Council (such as contingency plans and …
performance and extent of compliance by the Company, this
report also assigns them a rating for their environmental and administrative performance during the period
under review.
Environmental performance is concerned with actual or likely effects on the receiving environment from the
activities during the monitoring year. Administrative performance is concerned with the Company’s
approach to demonstrating consent compliance in site operations and management including the timely
provision of
of consent holders
to resource management and, ultimately, through the refinement of methods and
considered responsible resource utilisation, to move closer to achieving sustainable
development of the region’s resources.
1.1.4 Evaluation of environmental and administrative performance
Besides discussing the various details of the performance and extent of compliance by
the Company during the period under review, this report also assigns a rating as to the
Company’s environmental
washwater and
stormwater to minimise the requirement to abstract surface water.
Often when combined with efficient recycling, the small volumes of surface water
required to be abstracted for washing at quarries fit within the permitted activity rule
[Rule 15] of the Regional Fresh Water Plan for Taranaki. That is, the abstraction
volume shall not exceed 50 cubic metres per day, and the abstraction rate shall not
exceed 1.5 litres per second.
Vickers Quarries Limited holds no