Kaponga, or Patea treatment systems on
adjacent receiving waters were recorded in late summer-autumn under low flow conditions
during the monitoring period (at which time the Waverley system had been desludged with
bio-bugs, the Manaia system had been upgraded with the addition of two wetlands, the
Kaponga pond subsurface discharge rate was very low and receiving water dilution very high)
in early winter under higher flow conditions (when the Patea upgraded ponds system
discharged continuously),
… page
174
Appendix 6: Charging Policies
Resource Management Act Charging Policy
Schedule of Charges Pursuant to Section 36 of the Resource Management
Act 1991
SCHEDULE 1: SCALE OF CHARGES FOR STAFF TIME
Rate for processing resource consents
and responding to pollution incidents. Rate for all other Council work.
Professional staff $97/hr $92/hr
Professional/supervisory staff $123/hr $115/hr
Managers $178/hr $166/hr
Support staff $97/hr $92/hr
Directors
from Councillor D L Lean for lateness was received and
sustained.
Notification of Annual Plan and rates to be discussed under general business.
Late Items
page
1. Confirmation of Minutes – 25 February 2020
Resolves
That the Taranaki Regional Council:
takes as read and confirms the minutes and resolutions of the Ordinary Meeting
of the Taranaki Regional Council held in the Taranaki Regional Council chambers,
47 Cloten Road, Stratford, on Tuesday 25 …
effects on freshwater quality
inclusion of minimum flows (the point at which abstractions should cease) and allocation limits
for rivers to safeguard the ecosystem health and mauri of the water body
generally allowing gravel extraction from river and lake beds to minimise river aggradation
subject to the rate of extraction not exceeding the rate of gravel recharge, and
increased protection of wetlands to arrest their ongoing decline and incremental loss.
The Plan will
Longitude/Latitude or NZTM):
________________________ Longitude ________________________ Latitude OR
________________________ E ________________________ N (NZTM)
3.4 Legal description of property at site of activity (refer to land title or rates notice)
___________________________________________________________________________________________________
_________________________________________________________________________________
3.5
further dust
controls were required at the site. At approximately 1.18pm the first water truck
arrived, however the rate of application was insufficient to reduce the dust discharge
from the site. A second water truck arrived at 3.30pm. Dust discharge from the site
began reducing upon the application of water to the exposed surfaces from both water
trucks. 1,500 litres of Stabil-X was added to the water trucks. The application of
7 Affidavit of Daniel Charles Hunte
consent holders to resource management and, ultimately, through the refinement of methods
and considered responsible resource utilisation, to move closer to achieving sustainable development of the
region’s resources.
1.1.4 Evaluation of environmental and administrative performance
Besides discussing the various details of the performance and extent of compliance by the Company, this
report also assigns them a rating for their environmental and administrative performance during the period …
Regional Software Holdings Ltd—FY2024 Statement of Intent
consents for Urenui Beach Camp (2046-3) and Onaero Bay Holiday Park (1389-3) that requires
improvement. This rating was influenced by the ongoing exceedances of discharge volume limits from both
camps. No adverse effects have been identified in relation to these discharges and NPDC are being pro-
active in their efforts to resolve the issues. NPDC demonstrated a high level of administrative performance
with resource consents over the same period.
For reference, in the 2020-2021 year, consent
Freshwater recreational bathing summer 2019-2020 monitoring report