of consents 71 5.9
Alterations to the monitoring programme for 2014-2015 71 5.10
Recommendation 71 5.11
Summary of recommendations 72 6.
Acknowledgements 73 7.
Appendix I Resource consents held by the STDC for discharges from Waverley,
Kaponga, Manaia and Patea municipal oxidation ponds systems and the Waitotara
stock truck wastewater system 1
Appendix II Biomonitoring associated with the Kaponga oxidation ponds system 1
page
iv
List of
Glossary of common terms and abbreviations 72
Bibliography and references 73
Appendix I Resource consents held by Trustpower Ltd for the Mangorei HEP Scheme 77
page
iii
List of tables
Table 1 Residual flow release inspection compliance for the period mid 1992 to
mid 2014 11
Table 2 Summary of residual flow gauging results for the period of July 2013 to
June 2014 15
Table 3 Water temperature monitoring sites in the Waiwhakaiho River 25
Table 4
Environmental and administrative performance summary 68
12.5 Alterations and recommendations for 2022-2024 72
13 Wiremu Road Quarry Ltd 24rd Compliance Monitoring Biennial Report 2020-2022 73
13.1 Introduction 73
13.2 Resource consents 74
13.3 Compliance monitoring programme 74
13.4 Environmental and administrative performance summary 74
13.5 Alterations and recommendations for 2022-2024 77
Glossary of common terms and abbreviations 78
Bibliography and references 80
Appendix I
Contract R SBF 8109 Contract R 4.94
12/12/2016 5.25pm Contract R< SBF 8061 Contract R 6. 14
08/02/2017 2. 15pm Contract Ri SBF Origin Energy Contract R 15
16/02/2017 3, 45pm Contract R SBF Balance 966^ Contract R 1.8
24/02/2017 4.15pm Contract R SBF Methanex 9fl Contract R 3. 72
28/03/2017 3. 00pm Contract R Sand & Slu 9467 Contract R 3. 18
08/04/2017 1.45pm Contract R SBF Todd 9429 Contract R 14. 08
22/04/2017 2.30pm Contract R SBF Kupe9395 Contract R
17/05/2017 4.20pm Contract Ri SBF West
advocacy and
investment management 72
Ngā whakataunga pūtea
Financial statements 81
Te whākinga rawa i ngā ritenga pūtea tae
noa ki te tau i mutu i te 30 o Pipiri 2022
Statement of comprehensive revenue and
expense for the year ended 30 June 2022 82
Te whāriki i ngā tinihanga pūtea/rawa hoki
tae noa ki te tau i mutu i te 30 o Pipiri 2022
Statement of changes in net assets/equity
for the year ended 30 June 2022 83
Te whāriki i te āhuatanga pūtea tae noa ki
te tau i mutu i te 30 o
Submission 2: Taranaki Kiwi Trust 16
Submission 3: Recreation Aotearoa 26
Submission 4: Taranaki Fish and Game 42
Submission 5: Federated Farmers 49
Submission 6: Royal Forest and Bird Protection Society of New Zealand Inc. (Forest & Bird). 58
Submission 7: Youth Feedback 72
Submission 8: Pukeiti Rhododendron Trust 83
Submission 9: Health NZ National Public Health Service Te Manawa Taki 84
Hearing of Submissions on the Consultation Document for the 2024/2034 Long-Term Plan
Programme demonstrated a high level of environmental performance.
The companies monitored during the period under review were Downer EDI Works Ltd, Dialog Fitzroy Ltd,
and Katere Surface Coatings Ltd.
The companies hold three resource consents, which include a total of 72 special conditions setting out the
requirements that the companies must satisfy.
The Council’s monitoring during the year under review included 10 inspections and two deposition gauge
surveys.
The deposition gauge
Table 32 Tegel stormwater and wetland sampling results, 21 March 2022 63
Table 33 Summary of performance for Tegel consent 3470-4 64
Table 34 Summary of performance for Tegel consent 7389-1 65
Table 35 Summary of performance for Tegel consent 4026-3 66
Table 36 Summary of performance for Tegel consent 5494-2 67
Table 37 TIL stormwater sampling results 71
Table 38 Summary of performance for TIL consent 7578-1 71
Table 39 Summary of performance for TIL consent 6952-1 72
Greymouth Petroleum Ltd Turangi B Hydraulic Fracturing Monitoring Programme Report 2021 2023