Your search for '72' returned 957 results.

Annual report 2014-2015

8 7 8 Zinc mg/kg 300 73 94 68 80 72 67 Barium* mg/kg 10,000 590 5,400 284 588 2,200 1,090 Chloride mg/kg 700 8 19 9 32 38 110 Conductivity mSm-1 290 <10 <10 <10 <10 <10 <10 Sodium mg/kg 460 89 440 420 84 380 410 Soluble salts mg/kg 2,500 <500 <500 <500 <500 <500 <500 Sodium absorption ratio - 18 1.50 0.5 0.5 0.8 0.5 0.80 Table 3 Geary landfarm soil compliance results 2 Parameter Unit Consent Limit Spreading areas sampled G17 G18 G20 G23 G26 G27

Officer Report Opunake Power Limited 15 March 2022

associated intake to provide water to Opunake hydroelectric power scheme numbered_Paras RFWP Rules 20 & 64 numbered_Paras 5692-2.0 numbered_Paras To disturb the bed of the Waiaua River by removing sediment build-up upstream of a weir for the purpose of maintaining the Opunake hydroelectric scheme intake numbered_Paras RFWP Rule 72 numbered_Paras 10826-1.0 numbered_Paras To discharge water containing sediment from the Waiaua River to Opunake Lake numbered_Paras

Annual report 2016-2017

Farm 2 groundwater 60 Farm 3 groundwater 65 General 69 2.1.6 Waiokura Stream surface water quality 72 2.1.7 Biomonitoring 74 Fish passage temperature compliance in mixing zone 74 Lower stream water temperatures 76 Evaluation of fish passage 77 Macroinvertebrate surveys 81 Air 86 2.2.1 Inspections 86 2.2.2 Emission monitoring 86 2.2.3 Deposition gauging 87 Investigations, interventions and incidents 90 3 Discussion 93 Discussion of

Regional Cleanfills consent monitoring 2017-2018

14.4 Recommendations 71 15 Taranaki Trucking Company Ltd – Cardiff Road, Stratford 72 15.1 Site description and activities 72 15.2 Results 73 Inspections 73 Results of receiving environment monitoring 73 Investigations, interventions, and incidents 73 15.3 Discussion 73 Discussion of site performance 73 Environmental effects of exercise of consents 74 Evaluation of performance 74 Recommendations from the 2016-2017 Annual Report 76 Alterations to the

Annual report 2013-2014

Taranaki Drum and Pallet Recycling 69 Introduction 69 7.1 Process description 69 7.1.1 Air discharge permit 70 7.1.2 Results 70 7.2 Inspections 70 7.2.1 Investigations, interventions, and incidents 71 7.2.2 Discussion 71 7.3 Discussion of site performance 71 7.3.1 Environmental effects of exercise of consent 71 7.3.2 Evaluation of performance 71 7.3.3 Recommendations from the 2012-2013 Annual Report 72 7.3.4 Alterations to monitoring programmes for 2014-2015 72 7.3.5

Resource consent processing customer satisfaction survey

O ve ra ll le ve l o f s er vi ce re ce iv ed 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Disagree 1 5 0 0 0 0 0 0 0 1 0 2 5 3 2 2 11 11 3 2 14 5 6 13 7 0 0 0 4 3 7 9 10 10 3 10 11 5 3 11 13 23 13 16 4 0 0 11 14 15 39 18 8 10 40 43 13 4 31 32 42 53 60 1 2 2 47 43 56 23 55 50 55 41 39 63 Agree 5 72 66 63 54 46 0 1 6 53 71 53 48 39 60 60 27 28 41 Count 133 116 134 133 129 5 3 8 116 131

CD Boyd consent monitoring 2019-2020

7.2 Electrical Conductivity (EC) µS/cm 92 146 99 Acid soluble barium g/m3 <0.11 0.2 <0.11 page 18 SW3 Site MTH000060 IND001067 MTH000064 Collected 07 May 2020 07 May 2020 07 May 2020 Dissolved Barium g/m3 0.019 0.156 0.032 Total Sodium g/m3 6.2 9.5 6.9 Chloride g/m3 7.5 25 10 Total Dissolved Solids (TDS) g/m3 72 81 78 Total Suspended Solids g/m3 < 5 17 < 5 Table 10 Surface water monitoring round 4 16 June 2020 SW4 Site MTH000060 IND001067 MTH000064 …