e
C
a
rd
.c
o
.n
z
B
U
S
B
ET
TE
R
W
IT
H
Ta
g
o
n
t
a
g
o
ff
M
a
n
a
g
e
y
o
u
r
B
e
e
C
a
rd
C
o
n
ta
ct
T
a
ra
n
a
k
i’s
B
e
e
T
ea
m
..
.
IS
Y
O
U
R
B
EE
C
A
R
D
M
IS
-B
EE
-H
A
V
IN
G
?
W
e
e
kd
a
ys
o
n
ly
8
a
m
-5
p
m
0
8
0
0
B
EE
T
R
C
[0
8
0
0
2
3
3
8
72
]
E
m
a
il
u
s
at
Biomonitoring 31
Groundwater 34
2.4.1 Results 37
Air 44
Land and soil 44
2.6.1 Irrigation wastewater storage IND002044 44
2.6.2 Soil samples (irrigation areas) 46
2.6.3 Irrigation loading rates 56
2.6.4 Incidents, investigations, and interventions 58
Discussion 59
page
ii
Site performance 59
Environmental effects 62
Evaluation of performance 63
Recommendations from the 2022/23 Annual Report 72
Alterations to monitoring programmes for
in relation to the Kapuni-J fracturing event
Pre-fracturing 3mth post fracturing 1 year post fracturing
Sample date Unit 12/04/2023 19/12/2023 26/09/2024
Sample time - 10:25 11:45 13:30
Sample id. TRC - TRC2311827 TRC2315844 TRC2420119
pH pH 6.9 7.5 6.8
Temperature °C 14.5 16.4 14.4
Total alkalinity g/m3 CaCO3 87 84 72
Bicarbonate g/m3 HCO3 106 102 87
Total hardness g/m3 CaCO3 47 46 54
Electrical conductivity mS/m 25.5 24.1 29
Total dissolved solids
70 40.0 68 45
2017/18 9,310 71 35.5 85 71
2016/17 2,000 77 26.0 85 64
2015/16 9,919 92 36.8 70 59
Consent limit
5312-1 - - - - -
2014/15 13,403 58 18.3 119** 74
2013/14 15,299 69 18.0 93** 72
Note ** Maximum injection pressures were recorded during reporting periods prior to the consent limit of 85 bar being applied
page
17
Figure 4 Kaimiro-17 well: Historical injection volumes and injection pressures (2015-2024)
2.4.2 Summary of
performance for uncontaminated stormwater Consent 4620-1 68
Table 28 Summary of performance for discharge to land Consent 4621-1.1 69
Table 29 Summary of performance for composting air Consent 4622-1 70
Table 30 Summary of performance for air discharge Consent 4779-1.1 71
Table 31 Summary of performance for earthworks stormwater Consent 6177-2.0 72
Table 32 Summary of performance for earthworks stormwater Consent 10804-1.0 73
Table 33 Summary of performance for earthworks
and Risk Committee Minutes 23
9. Council Conduct Complaint 27
10. Appointment of Councillor Littlewood to Standing Committees 59
11. 2025/2026 Annual Plan and Estimates Approach 63
12. Meeting Dates for March 2025 72
13. Public Excluded
14. Public Excluded Recommendations 73
15. Confirmation of Public Excluded Ordinary Minutes 74
16. Receipt of Public Excluded Executive Audit and Risk Committee Minutes 78
17. Closing Karakia 81
18. Agenda Authorisation 82
Ordinary
Policy and Planning Agenda June 2023
Todd Energy Limited Deep Well Injection Annual Report 2023-2024
75 of the NES-FW, the
Council sets the following charges, under section
36(1)(cc) of the Resource Management Act 1991, for
monitoring permitted activities authorised under
regulations in the NES-FW installed after 3 September
2020. The Council may charge for monitoring permitted
activities for compliance inspections and monitoring
under the following sections of the regulations:
70 Culverts
72 Weirs.
Inspection (includes travel time, inspection, monitoring
and reporting)
alkalinity g/m3 CaCO3 89 110 89 150 72 180
Carbonate g/m3 CO3 < 1.0 < 1.0 < 1.0 < 1.0 < 1.0 < 1.0
Bicarbonate g/m3 HCO3 109 134 109 183 88 220
Total hardness g/m3 CaCO3 112 101 94 120 67 210
Electrical conductivity mS/m 29.2 28.7 25 35.1 20.2 49.5
Total suspended solids g/m3 < 3 < 3 < 3 13 < 3 90
Total dissolved solids g/m3 190 185 144 200 131 320
Dissolved aluminium g/m3 - - < 0.003 - < 0.003 0.004
Dissolved arsenic g/m3 - - < 0.0010 - < 0.0010 < 0.0010
Dissolved