Your search for '72&76 CUTFIELD ROAD WESTOWN' returned 2480 results.

Annual report 2009-2010

physicochemical parameters and site of measurement 8 Table 3 Analytical results from monthly samples: Maketawa Stream at Tariki Road 9 Table 4 Statistical summary of data from July 2009 to June 2010: Maketawa Stream at Tarata Road 10 Table 5 Statistical summary of data from July 2003 to June 2010: Maketawa Stream at Tarata Road 10 Table 6 Analytical results from monthly samples: Mangaoraka Stream at Corbett Road 12 Table 7 Statistical summary of data from July 2009 to June 2010: Mangaoraka

Coastal erosion information: inventory & recommendations for monitoring

coast: • Mokau to Pariokariwa - Tongaporutu (~2.5 km), Whitecliffs (~2 km) and Te Kuwhatahi Stream (~3 km) • Pariokariwa to Turangi Road - Urenui and NE cliffs (~3 km), Onaero (~2 km), Wai-iti (1-2 km) and Mimi (~2 km) • Turangi Road to Port – Waitara to Port (~12 km) and Motunui (1-2 km) • Port to Stony – Paritutu (~2 km) and Oakura to Pitone Rd • Stony to Cape Egmont - Stony River (~2.5 km) and Cape Egmont to Puniho Road (~10 km) • Cape Egmont to Opunake - Opunake (1-2

Annual report 2013-2014

Results and discussion 13 3.1 Flows and water temperature 13 3.1.1 Water temperature 14 3.2 Macroinvertebrate communities 15 3.2.1 Hangatahua (Stony) River 15 3.2.1.1 Mangatete Road site (STY000300) 16 3.2.1.2 SH 45 site (STY000400) 19 3.2.1.3 Discussion 21 3.2.2 Timaru Stream 23 3.2.2.1 Carrington Road site (TMR000150) 23 3.2.2.2 SH45 site (TMR000375) 26 3.2.2.3 Discussion 29 3.2.3 Mangaoraka Stream 30 3.2.3.1 Corbett Road site (MRK000420) 30 3.2.3.2

Annual report 2012-2013

tributary a result of the Company’s activities. Environmental performance by Winstone Aggregates was high. No incidents or complaints were reported in relation to operations carried out at the Winstone Aggregate, Wiremu Road quarry. For reference, in the 2012-2013 year, 35% of consent holders in Taranaki monitored through tailored compliance monitoring programmes achieved a high level of environmental performance and compliance with their consents, while another 59% demonstrated a good

Annual report 2011-2012

Community Index (MCI) 2 2.3.3 Gradations of biological ‘health’ 3 2.3.4 Semi Quantitative MCI (SQMCIs) 4 Trend analysis 4 2.4 Assessment of significant differences 5 2.5 Site locations 5 2.6 3. Results and discussion 13 Flows and water temperature 13 3.1 3.1.1 Water temperature 14 Macroinvertebrate communities 15 3.2 3.2.1 Hangatahua (Stony) River 15 Mangatete Road site (STY000300) 16 3.2.1.1 SH 45 site (STY000400) 19 3.2.1.2 Discussion 21 3.2.1.3 3.2.2

Annual report 2014-2015

14 3.2 Macroinvertebrate communities 15 3.2.1 Hangatahua (Stony) River 15 3.2.1.1 Mangatete Road site (STY000300) 16 3.2.1.4 SH 45 site (STY000400) 19 3.2.1.5 Discussion 21 3.2.2 Timaru Stream 23 3.2.2.1 Carrington Road site (TMR000150) 23 3.2.2.2 SH45 site (TMR000375) 26 3.2.2.3 Discussion 29 3.2.3 Mangaoraka Stream 31 3.2.3.1 Corbett Road site (MRK000420) 31 3.2.3.2 Discussion 34 3.2.4 Waiongana Stream 35 3.2.4.1 State Highway 3a site (WGA000260) 35

Annual report 2010-2011

Semi Quantitative MCI (SQMCIs) 4 2.4 Trend analysis 4 2.5 Assessment of significant differences 5 2.6 Site locations 5 3. Results and discussion 13 3.1 Flows and water temperature 13 3.1.1 Water temperature 14 3.2 Macroinvertebrate communities 15 3.2.1 Hangatahua (Stony) River 15 3.2.1.1 Mangatete Road site (STY000300) 16 3.2.1.2 SH 45 site (STY000400) 19 3.2.1.3 Discussion 21 3.2.2 Timaru Stream 23 3.2.2.1 Carrington Road site (TMR000150) 23 3.2.2.2

Eltham Central Landfill Annual Report 2021-2022

regionalised approach to waste disposal and the site is now currently a potential option as the replacement regional landfill once the facility at Colson Road, New Plymouth has reached capacity. The management of the delivery and operation of the facility, and the associated consents were transferred to New Plymouth District Council (NPDC) during the year under review. The Colson Road landfill closed to general waste in August 2019. However the use of the Central Landfill was put on hold and

Agenda

Transport Advisory Group Item 3 First Annual Monitoring Report for the Regional Land Transport Plan 2015-2021 Item 4 Requests to vary the Regional Land Transport Plan for Taranaki 2015/16 - 2020/21 Item 5 NZ Transport Agency Regional Report Item 6 Implementation of the One Network Roading Classification across the Taranaki region Item 7 Developing the 2018 Government Policy Statement on Land Transport Item 8 Passenger transport operational update for the quarter ending 30