Your search for '72&76 CUTFIELD ROAD WESTOWN' returned 2535 results.

Total Mobility around New Zealand July 2025

maximum contribution per trip is $30. Note: Taranaki Regional Council will pay 75% of the fare up to a maximum of $40. Any additional fare must be paid in full by the user. page 22 Contacts 0800 TOT MOB (868 662) www.trc.govt.nz/total-mobility (contains answers to frequently asked questions and forms). Taranaki Regional Council 47 Cloten Road Private Bag 713 Stratford 4352 transport@trc.govt.nz page 23 Wellington

Executive Audit and Risk Agenda July 2025

Taranaki Regional Council held at 10.00am on Monday 5 May 2025 at Taranaki Regional Council 47 Cloten Road Stratford b) noted the recommendations therein were adopted by the Taranaki Regional Council on Tuesday 13 May 2024. Walker/Williamson Executive Audit and Risk Committee - Confirmation of Executive Audit and Risk Committee Minutes - 16 June 2025 6 page Regional Stock Truck Effluent Strategy Review F Ritson advised of the initiation of a project to

Tawhiti Catchment Annual Report 2023-2024

immediately downstream of the Silver Fern Farms site at Tawhiti Road to assess flow volumes. The hydrometric station is required to be maintained under Consent 1103-4 (held by Silver Fern Farms) which provide for the discharge of cooling water from the meat processing plant. page 5 Figure 1 Industrial sites and physicochemical monitoring sites in the Tawhiti Catchment Table 2 Stream and discharge monitoring sites in the Tawhiti Catchment Site Code Location NZTM

Greenfern Hydro Scheme Annual Report 2023-2024

TRCID-2128948281-5418 (Word) Document: TRCID-1188382587-887 (Pdf) April 2025 page page Executive summary Greenfern Industries Ltd (the Company) operates a hydroelectric power station located on Normanby Road at Okaiawa, in the Waingongoro Catchment. Utilising an existing weir across the Waingongoro River and tunnel under Normanby Road, water is diverted for electricity generation. The station is located approximately 3.2km downstream of the weir, but due to the

Manawa Energy - Motukawa HEP Scheme Annual Report 2023-2024

ceased in order to allow for flow to top over the weir. Shortly afterwards rainfall alleviated the situation. Other operational requirements are in place once flows in the Waitara River at the Bertrand Road bridge drop below 5,000L/s to ensure that either the abstracted water is passed continuously through the lake, or that abstraction cease (with regard to the 150L/s residual flow in the race). At no point during the monitoring period did the flow in the Waitara River at the Bertrand Road

Ordinary Council Agenda June 2025

page Confirmation of Operations and Regulatory Committee Minutes – 29 April 2025 Resolved That the Taranaki Regional Council: a) took as read and confirmed the minutes of the Operations and Regulatory Committee of the Taranaki Regional Council held on 29 April 2025 at Taranaki Regional Council 47 Cloten Road Stratford b) noted the recommendations therein were adopted by the Taranaki Regional Council on Tuesday 13 May 2025. Hughes/White Resource Consents

McKechnie Aluminium Solutions Ltd Annual Report 2023-2024

Road in the Mangati Catchment. This operation was shifted to the main Paraite Road site during the 2008-2009 year and is now monitored under the existing consents for this site. The report includes the results and findings of the monitoring programme implemented by the Council in respect of the consents held by MASL that relate to discharges of water within the Mangaone1 Catchment, and the air discharge permit held by MASL to cover emissions to air from the site. This report is the 31st

Hickman JD 1997 Family Trust Annual Report 2023-2024

Document: TRCID-176456519-165 (Word) Document: TRCID-1188382587-421 (Pdf) February 2025 page page Executive summary The Hickman JD 1997 Family Trust (the Trust) operates a road transport depot located on Waitara Road at Brixton, Waitara, in the Waiongana catchment. The operations at this site mainly involve packaged dairy related products. Goods are stored under roofed catchments with the remaining areas being paved or gravel. The site also has a

Regional Cleanfill Round Annual Report 2023-2024

Figure 9 Taranaki Trucking Company Ltd's cleanfill and sampling site at Cardiff Road Stratford 41 List of photos Photo 1 A small amount of earth had been deposited at the cleanfill site, 27 May 2024 9 Photo 2 Prohibited material deposited at the top of the George cleanfill, 14 February 2024 15 Photo 3 Cleanfill material discharged to an unconsented area of the neighbouring property, 14 February 2024 16 Photo 4 Fresh cleanfill material had been discharged to the unconsented site on the