Samples were collected at two receiving water monitoring
sites upstream and downstream of the WWTP discharge. The Kaupokonui River was running at a moderate
swift flow - relatively clear and uncoloured. The flow rate at the Glenn Road telemetry site at the time of
sampling was estimated at 3.470 m³/s.
The WWTP surrounds were in a satisfactory condition, with sheep grazing the surrounds. No odours were
detected around the boundary of the site.
29 January 2018
An inspection was conducted
Samples were collected at two receiving water monitoring
sites upstream and downstream of the WWTP discharge. The Kaupokonui River was running at a moderate
swift flow - relatively clear and uncoloured. The flow rate at the Glenn Road telemetry site at the time of
sampling was estimated at 3.470 m³/s.
The WWTP surrounds were in a satisfactory condition, with sheep grazing the surrounds. No odours were
detected around the boundary of the site.
29 January 2018
An inspection was conducted
Location of proposed well
Other bore/wells within 500m of proposed bore/ well
Direction of ground slope
Location of septic tanks/offal pits
Waste disposal area
Effluent Ponds
Access road
Local Roads
Property boundaries
Any other relevant features
5 Details of the Activity
5.1 If you have discussed this proposal with council staff, please give the person’s name here:
significantly to the following
RLTP policies:
S3: Support the aims of Roadsafe Taranaki.
S4: Support the aims of Safer Journeys
G2: Focus on effective and efficient strategic road and rail
corridors, particularly between inter-regional ports.
A3: Ensure a range of travel options are available to the region’s
residents.
Impacts on RLTP:
The proposal does not negatively affect any other projects in the
RLTP, nor affect the overall integrity/affordability of the Plan. This
at
two sites in Brixton. These are at \Waitara Road in the Waiongana catchment and Pennington
Road, in the Waitara catchment. RNZ also operates a drilling waste remediation, composting
and vermiculture operation at Mokau Road, Uruti, in the Mimi catchment.
This report for the period July 2014-June 2015 describes the monitoring programme
implemented by the Taranaki Regional Council (the Council) to assess the Company’s
environmental performance during the period under review, the results
located
on Inaha Road at Manaia, in the Inaha and Kapuni catchments. The Kupe Production Station processes oil
and gas from the offshore Kupe wells. This report for the period July 2020 to June 2021 describes the
monitoring programme implemented by the Taranaki Regional Council (the Council) to assess the
Company’s environmental and consent compliance performance during the period under review. The report
also details the results of the monitoring undertaken and assesses the environmental effects
piggery located on 599A South Road at Hawera in the Tangahoe,
catchment. The piggery is a breeder grower and finishing operation with up to 5,000 pigs and piglets at any
one time, employing between four and five full time staff.
This report for the period July 2019 to June 2020 describes the monitoring programme implemented by the
Taranaki Regional Council (the Council) to assess the Company’s environmental and consent compliance
performance during the period under review. The report also …
Waste Remediation Services WRS Ltd Symes Manawapou Landfarms Annual Report 2022-2023
Council (the Council) on the
monitoring programme associated with resource consents held by three concrete batching plants in the
Taranaki Region, namely AML Ltd (Allied Concrete) on Mould Street in Waitara, Firth Industries on Glover
Road in Hawera, and Fletcher Concrete and Infrastructure Ltd (Fletcher Concrete) on Mountain Road in
Stratford.
The report includes the results and findings of the monitoring programme implemented by the Council in
respect of the consents held by Allied