350 22.5 0.3 0.3
Median 65 0.5 1.1 11 273 0.25 7.6 8 5.8 15.6 0.05 0.05
Number 137 83 144 141 143 140 143 141 104 140 143 142
2018-2019 monitoring results
16 Aug 2018 60 <1 1.6 <6 263 <4 7.6 6 10.2 12.2 0.13 <0.07
13 Sep 2018 68 <1 1.1 8 306 25 7.4 <8 5.0 13.0 <0.07 <0.07
18 Oct 2018 72 <1 0.9 <6 315 4 7.4 <3 3.0 16.4 <0.07 <0.07
21 Nov 2018 72 <1 1.7 8 300 6 7.7 <3 2.4 16.0 <0.07 <0.07
18 Dec 2018 60 <1 1.0 <6 264 <4 7.2 4 2.7 21.9 0.1 0.08
16 Jan 2019 53 <1
Executive, Audit & Risk Committee agenda October 2021
of the STOS EIL site 42
Figure 10 Aerial photograph of the Shell Taranaki Ltd T-3500 site 45
Figure 11 Other consented CMA discharges in the port area 53
Figure 12 Aerial photograph of Fonterra New Plymouth Coolstores 54
Figure 13 Aerial photograph of the Molten Metals site 57
page
page
1
1 Introduction
1.1 Compliance monitoring programme reports and the Resource
Management Act 1991
1.1.1 Introduction
This report is the
consent 7559-1.3 49
Table 21 Summary of performance for consent 7591-1.1 51
Table 22 Summary of performance for consent 5821-2 53
Table 23 Evaluation of environmental performance over time 54
List of figures
Figure 1 Derby and Surrey Road stockpiling facilities with associated landspreading area 1
Figure 2 Derby Road stockpiling facility with sampling locations and regional insert 15
Figure 3 Council soil sample locations Derby Road 2017-2018 20
Figure 4
Policy & Planning Committee agenda June 2017.
comply with this condition.
Table 5 Paddock size and application depth statistics for the paddocks that received irrigated wastewater
during the reported period
Parameter
Paddock number
A4 1 2 3 4 5 6 7 8 9 10
Paddock size (ha) 0.82 0.82 1.00 0.88 0.88 0.64 0.66 0.79 2.43 0.9 1.95
Maximum 15 day
application depth (mm) 207 18 53 64 77 245 95 291 65 35 74
The intention of this condition, which is consistent with appendix VIIA of the Regional Freshwater Plan, is to
avoid …
Manawa Energy Motukawa HEP Scheme Annual Report 2021-2022
Policy & Planning Committee agenda October 2021