Your search for '53 cumming street' returned 1579 results.

Annual report 2015-2016

On the basis of the reported irrigation volumes and effluent total nitrogen concentrations, as provided by the Company, the average nitrogen loading over the entire 110.8 ha (enlarged) area irrigated for the 2015-2016 review period was 215 kg/ha/y, being 250 kg/ha/y on Longview Farm and 53 kg/ha/y adjacent to the plant. (A total of 23,773 kg of nitrogen was applied to the entire area, including the extension, at an average concentration of 101 g/m³). The highest loading for a single sector

Taranaki June 2015 flood event

Appendix II Hydrograph and rainfall records 32 Appendix III Land resource information in the Waitotara catchment 53 Appendix IV Photographic record of event 55 Appendix V Response package and implementation framework 62 Appendix VI Government criteria for allocation of funding for rural infrastructure repair and funding application form 67 List of tables Table 1 Rainfall comparisons for February 2004, July 2006, and June 2015 11 Table 2: February 2004 monthly rainfall

Annual report 2013-2014

given in Table 2 below. Table 2 Irrigation zones – modelled water demand (after Rout, 2003) Zone No Take rate (L/s / Ha) Daily volume (m3/Ha) Annual volume (m3/Ha) Application depth (mm) 1 0.40 31 2,200 44 2 0.51 40 4,840 44 3 0.58 46 6,400 32 4 0.67 53 5,120 32 5 0.63 50 4,200 30 6 0.63 50 3,600 30 7 0.53 42 4,000 50 8 0.46 37 3,960 44 page 9 Figure 4 Pasture irrigation zones and locations of consented irrigation takes in

Colson Rd Landfill consent monitoring 2019-2020

sites on the Puremu Stream downstream of the landfill 39 Figure 10 Biomonitoring sites related to the Colson Road landfill, New Plymouth 47 page iv Figure 11 Chloride concentrations in the Colson Road groundwater bores, June 2006 to date 51 Figure 12 Nitrate/nitrite nitrogen concentrations in the Colson Road groundwater bores, June 2006 to date 52 Figure 13 Methane and temperature recorded by the landfill gas flare for the year under review 53 Figure 14 …

Annual report 2015-2016

the biomonitoring sites in the Inaha Stream and an unnamed tributary stream relating to discharges from the Taranaki By- Products plant. 47 Figure 9 Wastewater and fertiliser application areas with groundwater monitoring well locations 53 Figure 10 Nitrate/ Nitrite concentration at GND1058 Shearer 2011-2016 long term record 54 Figure 11 Groundwater level, Nitrate/Nitrite concentrations and conductivity in BH1 GND1054 2012-2016 54 Figure 12 Nitrite/Nitrate concentration and