2011-85.
page
page
page
Consent 7905-1
For General, Standard and Special conditions
pertaining to this consent please see reverse side of this document
Page 1 of 3
Doc# 1803315-v1
Discharge Permit
Pursuant to the Resource Management Act 1991
a resource consent is hereby granted by the
Taranaki Regional Council
Name of
Consent Holder:
Westside New Zealand Limited
Level 17
300 Queen Street
Not required
2018-2019 16,284 178 16.3 65 Not required
2017-2018 7,137 124 11.1 50 Not required
2016-2017 19,077 119 28.8 55 47
2015-2016 30,615 186 15.3 53 52
2014-2015 16,960 137 14.0 56 49
2013-2014 24,885 191 10.9 76 44
Note * reporting of average injection pressures are not required under consent 7897-1
Figure 6 Kaimiro-11 well: Daily injection volumes and injection pressures (2021-2022)
2.4.4 Summary of injection activities at the Turangi-A wellsite
consent. The AEE also notes that 4,000 tonnes has already been
applied to irrigation areas. 10,000 tonnes for cold air bunds and
1,000 tonnes is intended to be applied around the site.
Cold air bunds
53 The Officer’s Report (paragraph 69) summarises how the cold air
bunds are expected to operate. I note that the description indicates
that these bunds will effectively operate as a site monofill for
materials which do not meet relevant standards for sale as
compost. I consider that the
summer period. The frequency of odour complaints
received by regional councils could be expected to increase over this period
due to people being outside more often, making the most of warm weather.
Despite this AFTL has not been notified of any complaints to the TRC since
November 2021.
Observations and measurements
53 Observations of odour levels in and around the site have been made by
officers of the TRC, me and a T+T colleague of mine. Odour observations
can be
Ordinary Council Agenda August 2023
occurring under consent 9545-2.1 (2013-2019)
Deep well injection undertaken at Cheal-A wellsite via the Cheal-A4 injection well
Year Annual
volume (m3)
Max. injection
volume
(m3/day)
Maximum
injection rate*
(m3/hr)
Max. injection
pressure
(bar)
Avg. injection
pressure
(bar)
2018-2019* 34,145 641 27 100 68
2017-2018 19,217 115 9.7 99 77
2016-2017 20,119 129 13.3 104 74
2015-2016 16,988 123 5.3 104 53
2014-2015 14,705 117 13.4 140 69
limit - 200 - 276 -
2017-2018 19,217 115 9.7 99 77
2016-2017 20,119 129 13.3 104 74
2015-2016 16,988 123 5.3 104 53
2014-2015 14,705 117 13.4 140 69
2013-2014 12,880 142 12.0 209 58
page
18
Table 11 Summary of injection occurring under consent 10254-1 (2016-2018)
Deep well injection undertaken at Cheal-B wellsite via the Cheal-B3 injection well
Year Annual
volume (m3)
Max. injection
volume
(m3/day)
Maximum
injection rate
Agenda for Ordinary Council meeting June 2017
STOS KA-19/20 wellsite consent monitoring report - Taranaki Regional Council.
modelled water demand (after Rout, 2003)
Zone No Take rate (L/s / Ha) Daily volume (m3/Ha)
Annual volume
(m3/Ha)
Application depth
(mm)
1 0.40 31 2,200 44
2 0.51 40 4,840 44
3 0.58 46 6,400 32
4 0.67 53 5,120 32
5 0.63 50 4,200 30
6 0.63 50 3,600 30
7 0.53 42 4,000 50
8 0.46 37 3,960 44
Figure 4 shows the pasture irrigation zones defined by Rout, 2003 and the
development potential of those zones.
1.1.8 Irrigation in Taranaki
Most of the