Your search for 'riparian' returned 992 results.

Flexgas Ltd Ahuro B Gas Storage Facility Annual Report 2021-2022

and 5ST-1 July 2021-June 2022 Figure 5 Monthly top hole pressures for Ahuroa B gas wells 2A, 3, 4 and 5ST-1 July 2021-June 2022 2.3 Pipeline The gas pipeline between AGS and SPS was constructed and commissioned between January and October 2013. Various silt retention measures, including hay bales, silt cloth, fluming, bunds and rip-rap, were used along the pipeline, and revegetation with grass and by riparian planting took place when soil moisture levels became suitable. No

Annual report 2015-2016

fish pass 22 Figure 6 Layout of the Graeme Lowe Protein site and location of sampling sites 31 Figure 7 Daily water abstraction by Graeme Lowe Protein, July 2015 – June 2016, m³ 39 Figure 8 Location of Taranaki Fish and Game trout hatchery showing discharge site and stream sampling sites 48 List of photographs Photo 1 The bio-filter at Graeme Lowe Protein 33 Photo 2 Riparian stabilisation works at Graeme Lowe Protein, 12 April 2016 38 Photo 3 The settling system at

Regional collaboration and shared services

can also be used to share news or promote events such as riparian planting. The councils are committed to developing LAWA to provide data for all environmental domains – air, land, biodiversity, coast and soil. Benefits  The LAWA website gives organisations, scientists and the public direct access to environmental data across New Zealand in a standardised way.  Allows people to learn independently about the state of our environment. LET’S GO RIDE-SHARE BOOKING WEBSITE

Annual report 2016-2017

Mangati Catchment consent monitoring Annual report 2016-2017

Future directions for management of gravel extraction in Taranaki rivers and streams

accepts an increased risk of flooding and erosion and the associated loss of land, instream and stream bank habitat, riparian vegetation, regional assets and possibly human life. The risk associated with doing nothing may be too great and the consequences too severe to implement such a philosophy. Option 2: Amend relevant sections in the Freshwater Plan to allow and promote appropriate riverbed gravel extraction – this option, which is the preferred alternative, involves relatively minor