Your search for 'riparian' returned 991 results.

STDC townships wastewater treatment consent monitoring 2018-2019

consideration of upgrading the treatment system during the consent renewal process in the 2007-2008 period (CH2M Beca Ltd, 2006). Upgrades to the system were completed by late May 2008. Infiltration remedial work has a lesser priority for the Kaponga system than elsewhere in South Taranaki. Riparian fencing and planting of the river margin adjacent to the ponds system has also been undertaken. The installation of a mechanical step-screen at the inlet was undertaken during the latter months of the

Consultation Document for Draft Annual Plan 2019/2020

The Council’s activities are delivered through a range of policies, plans and strategies, and through our flagship programmes – most notably Towards Predator-Free Taranaki and the Riparian Management Programme. Through its work, the Council is improving lifestyles, supporting livelihoods and taking Taranaki forward. Improving lifestyles Supporting livelihoods Taking Taranaki Forward Checking river health Testing marine life Monitoring swimming spots Ensuring …

Freshwater abstractions permitted activity review

rely on s14(3)(b) as allowing essentially unrestricted use. This approach has its limitations as pressure on water resources increases and the limit setting and water accounting requirements of the NPS prevail. This historic riparian owners right to take reasonable stock and domestic water are therefore limited. The Council released a notice to consent holders in November 2011 after the 2010 Resource Management (Measurement and Reporting of Water Takes) Regulations were

Annual report 2014-2015

throughout the majority of the period page 6 Figure 2 Aerial location map of the Opunake wastewater treatment system and sampling sites page 7 The site is leased out for sheep farming in the sewage treatment area and two other areas of land in the treatment plant have been leased out for grazing of cattle (STDC, 2015). A public walkway through the area is maintained by the Council and riparian planting of the receiving stream (Figure 1) was performed

Annual report 2014-2015

Hongihongi-Herekawe catchment consent monitoring report - Taranaki Regional Council.

Eltham waste water plant monitoring 2019-2020

Waingongoro River below the Mangawhero Stream confluence, with improvements in the macroinvertebrate fauna noted at these sites in comparison with historical (pre-wastes diversion) data. State of the environment trend monitoring over a twenty-plus year period has shown significant statistical and ecological improvements in stream and river biological health at both sites downstream of the wastewater outfall. Future riparian planting and the movement towards dairy shed treated waste irrigation to …

Flexgas Ltd Ahuro B Gas Storage Facility Annual Report 2021-2022

and 5ST-1 July 2021-June 2022 Figure 5 Monthly top hole pressures for Ahuroa B gas wells 2A, 3, 4 and 5ST-1 July 2021-June 2022 2.3 Pipeline The gas pipeline between AGS and SPS was constructed and commissioned between January and October 2013. Various silt retention measures, including hay bales, silt cloth, fluming, bunds and rip-rap, were used along the pipeline, and revegetation with grass and by riparian planting took place when soil moisture levels became suitable. No

Annual report 2013-2014

C Boyd drilling waste disposal consent monitoring report - Taranaki Regional Council.