control were:
• Volume and rate of abstraction;
• Daily timing of abstraction;
• Effects on adjacent bores, the aquifer, river levels, wetlands and sea water
intrusion;
• Fitting of equipment to regulate flows and to monitor water volumes, levels,
flows and pressures;
• Payment of administrative charges;
• Monitoring and report requirements;
• Duration of consent; and
• Review of the conditions of consent and the timing and purpose of the review.
Todd Energy Limited holds water
wetlands and sea water
intrusion;
• Fitting of equipment to regulate flows and to monitor water volumes, levels,
flows and pressures;
• Payment of administrative charges;
• Monitoring and report requirements;
• Duration of consent; and
• Review of the conditions of consent and the timing and purpose of the review.
This permit was issued by the Council on 13 February 2013 under Section 87(d) of
the RMA. It is due to expire on 1 June 2027.
Consent conditions were imposed on Greymouth
25
-M
ar
-1
1
12
-A
pr
-1
1
Sample Dates
E
.
c
o
li
(
n
o
s
./
1
0
0
m
l)
Action level
Alert level
addition, a wetland had been created recently at Peringa Park to improve the quality
of stormwater runoff entering the lake.
The data for this site are presented in Table 3 and illustrated in Figure 2, with a
statistical summary provided in Table 4.
Table 3 Analytical results for Lake Rotomanu
Time
Conductivity
@ 20°C
Freshwater recreational bathing summer 2019-2020 monitoring report
South Taranaki water supplies resource consent monitoring report 2018-2019
Taranaki Regional Council meeting agenda May 2020
Taranaki Regional Council Annual Report 2019/2020
Executive, Audit & Risk Committee agenda October 2020
lake or in the vicinity of the lake edge
throughout most the period and were often attracted to the immediate vicinity of the
sampling site by public feeding of the ducks. Lake levels were relatively consistent
throughout the period. A wetland had been created recently at Peringa Park to
improve the quality of stormwater runoff entering the lake.