consents upstream of the Okato WTP
Consent No. Purpose Monitoring Compliance
achieved?
1001-4 To discharge treated dairy shed effluent by oxidation
ponds into the Mangatete Stream
Annual
inspection
Yes
2379-2 To discharge untreated farm dairy effluent by spray
irrigation onto and into land
Annual
inspection
Yes
3969-2
To discharge dairy effluent from an oxidation pond
treatment system and a wetland into the Mangatete
Stream
Annual
inspection
Yes
effects were noted of any previous discharge.
Minimal flaring noted, wetland area clear of contaminants and local wildlife observed.
18th January 2014
Perimeter inspection undertaken. Storm water outlet into Kapuni stream was
inspected, no water was observed to be discharging at the time of inspection and no
visual effects of any previous discharge to surrounding vegetation or within the
Kapuni stream noted. No flaring undertaken at the time of inspection. Strong Westerly
winds were
Regional cleanfills consent monitoring report - Taranaki Regional Council.
will not cause the above adverse effects.
The Council was satisfied that the activity meets all the standards for a controlled
activity. It had to therefore grant the consent but imposed conditions in respect of
those matters over which it had reserved control. Those matters over which the
Council has reserved its control are:
• Volume and rate of abstraction;
• Daily timing of abstraction;
• Effect on adjacent bores, the aquifer, river levels, wetlands and sea water
STDC former landfills consent monitoring Annual report 2016-2017
Taranaki Regional Council Annual Plan 2017/2018.
Draft Annual Plan 2017/2018.
completed by mid December 2009. In addition, a wetland
page
10
Lake Rotomanu at Western Beach
1
10
100
1000
10000
02
-N
ov
-0
9
17
-D
ec
-0
9
22
-D
ec
-0
9
06
-J
an-
10
14
-J
an-
10
18
-J
an-
10
04
-F
eb
-1
0
16
-F
eb
-1
0
01
-M
ar
-1
0
15
-M
ar
-1
0
19
-M
ar
-1
0
22
-M
ar
-1
0
31
-M
ar
-1
0
Sample Dates
E
.
c
o
li
(
n
o
s
./
1
0