Your search for 'Rates' returned 2126 results.

Water measurement code of practice

volumes 28 C3.6 Test flow rates 28 C3.7 Verification methods for open channels 28 C3.8 Verification methods for partially full pipes 29 C3.9 Determination of measurement accuracy compliance 29 C3.10 Site verification 29 C3.11 Verification report 29 C3.12 Non-compliance 30 C4 Open channel water measurement technique 30 C4.1 Measurement techniques 30 C4.2 Stage-discharge method 32 C4.3 Recommended decision process 32 C4.4 Recommended service interval for open

Council meeting agenda August 2019

b) approves the Taranaki Stadium Trust’s request for major transaction approval in relation to the up to $50m repair and upgrade programme for Yarrow Stadium. MacLeod/Joyce 8. Setting of Rates: 2019/2020 8.1 Mr M J Nield, Director-Corporate Services, spoke to the memorandum, advising Members that having adopted the 2019/2020 Annual Plan on 21 May 2019, the purpose of this memorandum is to set the rates for the 2019/2020 financial year. The rates are driven from the adopted

Annual Report 2014/2015 - full document

surplus of $761,000 (total comprehensive income). Expenditure was $777,000 below budget while revenue was $238,000 above budget. This was a good result, noting that general rates had been raised by around 1.5% for each of the previous two years, which is well below inflation levels. The Council’s balance sheet remains very strong with no public debt. We gratefully acknowledge the efforts and achievements of Council staff during the year, ably governed by a team of Councillors providing

Annual Report 2013/2014 - full document

regional plan requirements. The non- compliance rate for failure to meet resource consent conditions was 6.6% for dairy farms, a small change from the previous year. The Council will continue to monitor farm dairy effluent systems closely to ensure compliance with the Council’s requirements. Complementing the agricultural monitoring programme, the Council inspected 221 minor industrial operations in 2013/2014. Minor industries include agricultural services, light engineering, panel beaters,

Annual Report 2015/2016 - full document

remain high for the Mt Messenger and Awakino projects. STRONG FINANCIAL POSITION The Council finished the 2015/2016 year with a surplus of $963,000 (total comprehensive income). Expenditure was $373,000 over budget, in large part due to the Council providing unbudgeted emergency funding to assist those in need following the severe winter storm damage. Overall it was a good result, noting that general rates increases have been at or below the rate of inflation

ST water supplies monitoring report 2018-2019

good level of administrative performance. STDC has advised council that the breaches in discharge rates at Opunake should be resolved by February 2020. The non-compliant breaches became apparent when council received the discharge data at the end of the monitoring year. For reference, in the 2018-2019 year, consent holders were found to achieve a high level of environmental performance and compliance for 83% of the consents monitored through the Taranaki tailored monitoring programmes,

Annual report 2015-2016

production bore, abstraction pipework monitoring equipment and associated infrastructure; and  obtaining manual measurements of groundwater levels in the production and observation bores and retrieving electronic data. To monitor the exercising of consent 7470-1.1 abstraction volume and rate data are recorded electronically at the site by a data logging system and transferred to the Council via telemetry, so the data can be viewed in real time. Three groundwater monitoring bores were also

Annual report 2014-2015

monitor the exercising of consent 7470-1.1 abstraction volume and rate data is recorded electronically at the site by a datalogging system and is transferred to the Council via telemetry, so the data can be viewed in real time. Three groundwater monitoring bores were also installed within the vicinity of the production bore to monitor the effects of the abstraction on local groundwater levels. Groundwater levels within two of the monitoring bores (GND2102 and GND2103) are monitored electronically

Freshwater abstractions permitted activity review

Taking and use of groundwater ...........................................................................24 page page 5 1 Introduction Currently, the minor taking and use of surface and groundwater in the Taranaki region is a Permitted Activity within the Taranaki Regional Council’s Regional Freshwater Plan [“Plan”], subject to various conditions relating in the main to abstraction flow rates and daily volumes (refer Appendix One).

Exec Audit Risk Agenda Feb 2020

advocacy and investment management 192,928 183,495 -9,433 723,916 748,505 24,589 1,760,516 Direct charges revenue 384,686 298,463 86,223 1,461,536 1,454,815 6,721 4,376,777 Rent revenue 127,149 95,833 31,316 535,635 479,165 56,470 1,150,000 Dividends 2,500,000 0 2,500,000 6,000,000 4,000,000 2,000,000 8,000,000 General rates revenue 1,988,598 1,988,598 0 3,977,196 3,977,196 0 7,954,392 Targeted rates revenue 1,492,806 1,492,793 13 2,985,613 2,985,586 27 5,971,173 Direct charges