6 for a summary of total stream length in different land cover
classes for each FMU).
Although indigenous forest is the dominant land cover in the upper sections of the Southern Hill Country
and Northern Hill Country FMUs, the proportions of stream reach graded in band A appear relatively high
considering that the geology and terrain in both of these FMUs are particularly prone to high rates of
sediment erosion. It should be noted that there was limited available monitoring
Crossing, an emerging ‘Great
Walk’ set to boost the region’s burgeoning reputation as a visitor destination.
The Council is also confident about its plans to build on recent gains in freshwater quality; to develop its
education programme; and to broaden and deepen its relationship with iwi and hapū.
Financially, the impact of our proposals is relatively minor. There is an increase of 4.5 percent in the general
rates take for 2018/2019. In the last three years, the average general rates
an emerging ‘Great
Walk’ set to boost the region’s burgeoning reputation as a visitor destination.
The Council is also confident about its plans to build on recent gains in freshwater quality; to develop its
education programme; and to broaden and deepen its relationship with iwi and hapū.
Financially, the impact of our proposals is relatively minor. The Council is proposing an increase of 3.5 percent in
its general rates take for 2018/2019. In the last three years, the average
Walk’ set to boost the region’s burgeoning reputation as a visitor destination.
The Council is also confident about its plans to build on recent gains in freshwater quality; to develop its
education programme; and to broaden and deepen its relationship with iwi and hapū.
Financially, the impact of our proposals is relatively minor. There is an increase of 4.5 percent in the general
rates take for 2018/2019. In the last three years, the average general rates increase has been 0.97%. Over
emerging ‘Great
Walk’ set to boost the region’s burgeoning reputation as a visitor destination.
The Council is also confident about its plans to build on recent gains in freshwater quality; to develop its
education programme; and to broaden and deepen its relationship with iwi and hapū.
Financially, the impact of our proposals is relatively minor. The Council is proposing an increase of 3.5 percent in
its general rates take for 2018/2019. In the last three years, the average general rates
discussing the various details of the performance and extent of compliance by CCCWSL, this report
also assigns them a rating for their environmental and administrative performance during the period under
review.
Environmental performance is concerned with actual or likely effects on the receiving environment from the
activities during the monitoring year. Administrative performance is concerned with CCCWSL’s approach to
demonstrating consent compliance in site operations and management including …
studies undertaken in the late 1980s by
the Taranaki Catchment Commission showed that the entire Taranaki coastline is eroding at
long term average rates between 0.05 m/year and 1.89 m/year with exceptions at the Patea
and Stony (Hangatahua) river mouths where the coast was accreting. Erosion rates differ at
different locations, primarily due to differences around the coast in geology, coastal
orientation, proximity to river mouths and matters such as dune management.
Recalculating erosion
Council’s 2015/2025 Long-Term Plan It is
firmly focused on resources, environment and people, which are at the core of our work.
It also sets out how we intend to maintain our status as
one of the lowest-rating Councils in New Zealand while
still maintaining a high standard of programmes and
services. The 2015/2016 year will see a decrease of
$30,414, or a little over a third of 1%, of the Council’s
total rates take (the combination of general rates,
targeted rates and
7)).
f. Insufficient characterisation of soils, particularly the
Anthropic Soils identified in the upper irrigation areas, to
determine the suitability of the irrigation rates and proposed
irrigation regime.
24 The Officer’s Report proposes Condition 37, which details the
requirements for a Site Exit Plan (SEP). Condition 37 proposes a
start date for preparation of the SEP (within 3 months of the
commencement date of these consents). I recommend the
inclusion of a date that the
air traffic control and navigational aids, refuelling services and significant areas of land
and buildings to serve commercial tenants. All of these facilities are situated on land at the Airport
designated within the District Plan.
Average annual passenger growth rate is anticipated to be 5% per annum and in the period from 2018 to
2038 air passenger volume through New Plymouth is expected to grow from 430,000 to 1,200,0001. A new
terminal building is currently under