Your search for 'rain fall' returned 1977 results.

Long-Term Plan 2018/2028

Kaitake Trail being developed by the New Plymouth District Council on a paper road down the coast, as an integral part of the Taranaki Crossing. This link would include a treetop canopy walk across a rain forested valley.  To also invest directly in the Kaitake Trail proper.  To complete outer tracks and a lookout at Pukeiti to complement the Taranaki Crossing.  To establish a family tramping hut within Pukeiti, as well as a new link to nearby commercial accommodation. page

Freshwater recreational bathing summer 2018-2019

latest survey period was lower than normal in comparison with historical surveys. The total number of samples falling within the “Alert” or “Action” categories (39% of samples) across the 16 recognised bathing sites was among the highest recorded. However, it should be noted that the “Action” category is the only category for which swimming is not recommended. In the 2018-2019 season, 79% of all samples met the national bathing guideline. Of the 21% of samples that exceeded the

Policy & Planning agenda November 2018

Councillor B K Raine Councillor D L Lean (ex officio) Councillor D N MacLeod (ex officio) Representative Ms E Bailey (Iwi Representative) Members Councillor G Boyde (Stratford District Council) Mr J Hooker (Iwi Representative) Councillor R Jordan (New Plymouth District Council) Mr P Muir (Taranaki Federated Farmers) Councillor P Nixon (South Taranaki District Council) Mr M Ritai (Iwi Representative) Apologies Councillor C S Williamson Notification of Late Items

Taranaki By Products Air and Water Annual Report 2021-2022

stock. There were issues around keeping buried product in the ground due to elevated groundwater levels, the officer noted that the pits appeared to be well managed. At the time of the inspection a discharge pipe to pond 1 had been damaged and product is leaking into the ground. TBP was advised that this needed to be resolved before the next inspection. 4 May 2022 At the time of the inspection, the inspecting officer was advised that heavy rain had contributed to high groundwater levels

SOE2022 Climate

are around 13-14°C, while temperatures at Taranaki Maunga Dawson Falls and North Egmont Visitor Centre average slightly over 9°C. Winter temperatures average between 7 and 8°C, with a fresher 3°C at our mountain sites. Summer daily averages are from 19 to 20°C, and 16°C on Taranaki Maunga. Although summer days can feel hot, the temperate climate, and our proximity to the ocean mean that, in summer, the mercury rarely climbs above 30°C. Averages °C New Plymouth

Ōpunake Flood Control Scheme Asset Management Plan

hectares (248 ha in the Hihiwera and 69 ha in the Allison Street catchment. The most upstream extent of the catchment lies only 4.5 km to the northwest of the Opunake Township with the land falling at a relatively uniform grade over its total length. The stream channels are therefore not directly affected by rainfall events on Mount Taranaki but it is clear that the mountain affects the nature of rainfall events. The catchment is almost exclusively used for dairy farming with very

Consents issued 26 May-13 July 2017

Water - Animal Waste Dairy Farm Replace R2/1982-3.0 Medley Partners Land - animal waste Dairy Farm Replace R2/3720-2.1 PJ & RE Roberts Family Trusts Land - animal waste Dairy Farm Change R2/3201-2.1 Juloss Partnership Land - animal waste Dairy Farm Change R2/5056-2.0 Te Rere o Kapuni Limited - T/A Dawson Falls Mountain Lodge Land - Misc Sewage Treatment Replace R2/1078-3.0 Tosland Trusts Partnership Land - animal waste Dairy Farm Replace R2/3516-3.0 MJ Corric Estate Land -

Freshwater & coast recreation survey 2019-2020

E.coli/Enterococci samples falling in each band of the MfE contact recreation guidelines over the 2018-2019 bathing season 21 Figure 15 Do questionnaire respondents check conditions prior to visiting a recreational site? 22 page iii Figure 16 Conditions checked by survey respondents prior to visiting a site 22 Figure 17 Websites used when checking site conditions prior to a visit 23 Figure 18 If questionnaire respondents would still visit a recreational site when a …

Remediation NZ Ltd consent monitoring 2019-2020

2 Results 2.1 Inspections 30 July 2019 An inspection was undertaken under consent 5838-2.2 (this is the discharge to land consent) as part of routine compliance monitoring. The inspection was carried out in fine weather conditions following rain within the previous 24 hours. The surface water bodies across the site were elevated, swift and turbid. An inspection of the site found that the irrigation areas were wet with standing water observed on the uppermost irrigation area. …