contaminant from any industrial or trade premises into air, unless
the activity is expressly allowed for by a resource consent , a rule in a regional plan,
or by national regulations.
The Council determined that the application to discharge emissions to air associated
with the exploration activities at the Cheal-B wellsite fell within Rule 9 of the
Regional Air Quality Plan (RAQP).
The standard/term/conditions associated with Rule 9 are as follows:
• Flare or incinerator point is at least 300
Stadium Taranaki has been redeveloped to support our vision of creating the best regional stadium in New Zealand that regularly hosts local, regional, national, and international sports and entertainment events. The major project to redevelop the venue has included upgrades to the West Stand to ensure it meets the required earthquake standards and the rebuilding of the East Stand with a new fit-for-purpose flexible and scalable facility. Taranaki Regional Council, as owner of the venue via the
commercially successful hydrocarbon producing area in
New Zealand. Oil and gas exploration and development has been on-going in the
region for nearly 150 years. Since the first well in 1865, over 600 exploration and
production wells have been drilled. While the majority of the basin is offshore, the
majority of the producing wells are onshore. The geology of the basin is derived from
diverse episodes of tectonic activity. The Cretaceous to Quaternary basin fill is up to
9,000 m thick in places.
to the memorandum updating the members on the updates made
to the submission following the feedback received from members at the previous
Policy and Planning meeting.
Resolved
That the Taranaki Regional Council:
a) received the memorandum titled Revised Biodiversity Credits Submission
b) endorsed the submission in Attachment One on the Helping nature and people
thrive: Exploring a biodiversity credit system for Aotearoa New Zealand – Discussion
document
Policy and
page
Todd Energy Ltd
McKee Production Station
Monitoring Programme
Annual Report
2016-2017
Technical Report 2017-56
Taranaki Regional Council
ISSN: 1178-1467 (Online) Private Bag 713
Document: 1918851 (Word) STRATFORD
Document: 1988106 (Pdf) March 2018
page
page
Executive summary
Todd Energy Ltd operates a petroleum production station located on Otaraoa Road near Tikorangi, bridging
the
performance and compliance with their consents, while another 29%
demonstrated a good level of environmental performance and compliance with their
consents.
1.2 Process description
1.2.1 Background
The Taranaki Basin occupies an area of approximately 100,000 square kilometres and
is the most explored and commercially successful hydrocarbon producing area in
New Zealand. Oil and gas exploration and development has been on-going in the
region for nearly 150 years. Since the first well in
injection wells for both waste
discharge and enhanced oil recovery is presented in Figure 1.
Further details regarding hydrocarbon exploration and production
in Taranaki, the DWI process and its history within region can be
found in previous compliance reports published by the Council
(see Bibliography).
1.3 Resource consents
Sections 15(1)(b) and (d) of the RMA stipulate that no person may
discharge any contaminant onto land if it may then enter water, or
from any industrial or trade
hydrocarbon producing area in New
Zealand. Oil and gas exploration and development has been on-going in the region for
nearly 150 years. Since the first well in 1865, over 600 exploration and production wells
have been drilled. While the majority of the basin is offshore, the majority of the
producing wells are onshore. The geology of the basin is derived from diverse episodes
of tectonic activity. The Cretaceous to Quaternary basin fill is up to 9,000 m thick in
places.
The modern era of
page
Boyd Drilling Waste and Stockpiling
Landfarm and Landspreading
Monitoring Programme
Annual Report
2020-2021
Technical Report 2021-87
page
Taranaki Regional Council
Private Bag 713
Stratford
ISSN: 1178-1467 (Online)
Document: 2959461 (Word)
Document: 2965598 (Pdf)
March 2022
page
CD Boyd Drilling Waste and Stockpiling
Landfarm and Landspreading
discharge uncontaminated stormwater and treated stormwater from hydrocarbon
exploration and production operations onto and into land
page
Non-notified authorisations issued by the Taranaki Regional Council
between 03 Mar 2017 and 20 Apr 2017
R2/5485-2.0 Commencement Date: 22 Mar 2017
Shell Exploration NZ Limited Expiry Date: 01 Jun 2033
Private Bag 2035, New Plymouth 4342 Review Dates: June 2021, June 2027
Activity Class: