NPDC Urenui and Onaero Beach Camps Annual Report 2023-2024
NPDC Urenui and Onaero Beach Camps Annual Report 2023-2024
NPDC Urenui and Onaero Beach Camps Annual Report 2023-2024
are around 13-14°C, while temperatures at Taranaki Maunga Dawson Falls and North Egmont Visitor Centre average slightly over 9°C. Winter temperatures average between 7 and 8°C, with a fresher 3°C at our mountain sites. Summer daily averages are from 19 to 20°C, and 16°C on Taranaki Maunga. Although summer days can feel hot, the temperate climate, and our proximity to the ocean mean that, in summer, the mercury rarely climbs above 30°C. Averages °C New Plymouth
2 Results 2.1 Inspections 30 July 2019 An inspection was undertaken under consent 5838-2.2 (this is the discharge to land consent) as part of routine compliance monitoring. The inspection was carried out in fine weather conditions following rain within the previous 24 hours. The surface water bodies across the site were elevated, swift and turbid. An inspection of the site found that the irrigation areas were wet with standing water observed on the uppermost irrigation area. …
consent or a rule in a regional plan, or it falls within some particular categories set out in Section 14. Permits authorising the abstraction of water are issued by the Council under Section 87(d) of the RMA. Water discharge permits Section 15(1)(a) of the RMA stipulates that no person may discharge any contaminant into water, unless the activity is expressly allowed for by a resource consent or a rule in a regional plan, or by national regulations. Permits authorising discharges to water
E.coli/Enterococci samples falling in each band of the MfE contact recreation guidelines over the 2018-2019 bathing season 21 Figure 15 Do questionnaire respondents check conditions prior to visiting a recreational site? 22 page iii Figure 16 Conditions checked by survey respondents prior to visiting a site 22 Figure 17 Websites used when checking site conditions prior to a visit 23 Figure 18 If questionnaire respondents would still visit a recreational site when a …
hectares (248 ha in the Hihiwera and 69 ha in the Allison Street catchment. The most upstream extent of the catchment lies only 4.5 km to the northwest of the Opunake Township with the land falling at a relatively uniform grade over its total length. The stream channels are therefore not directly affected by rainfall events on Mount Taranaki but it is clear that the mountain affects the nature of rainfall events. The catchment is almost exclusively used for dairy farming with very
Lower Waiwhakaiho Catchment Annual Report 2022-2023
by the Resource Management Act 1991 (RMA). However, constraining attention only to resource management issues which fall within the CMA fails to recognise the integrated nature of the wider coastal environment. For this reason, it is proposed to extend the coverage of the reviewed Coastal Plan to include the wider coastal environment. While values inland of the CMA can be recognised through the Coastal Plan, rules will only apply within the CMA area where the Council has
by the Resource Management Act 1991 (RMA). However, constraining attention only to resource management issues which fall within the CMA fails to recognise the integrated nature of the wider coastal environment. For this reason, it is proposed to extend the coverage of the reviewed Coastal Plan to include the wider coastal environment. While values inland of the CMA can be recognised through the Coastal Plan, rules will only apply within the CMA area where the Council has
water, unless the activity is expressly allowed for by a resource consent or a rule in a regional plan, or it falls within some particular categories set out in Section 14. page 6 Trustpower holds water permit 0489-2 to cover the damming and diversion of the Patea River from Lake Rotorangi through the intake and spillways. This permit was issued by the Council on 25 June 2009 under Section 87(e) of the RMA, and following appeal, commenced on 17 December 2010. Trustpower