establishment of vegetation, were stripped in heavy weather
in September 2015 (Figure 5).
Since this date, numerous attempts had been undertaken to re-establish the vegetation, however wind and
rain erosion had hindered the progress.
Figures 6 and 7 denote the follow up re-sown grass which was undertaken in May 2016. The re-sown grass
was blown out through wind and rain erosion throughout the 2016 winter. In February of 2017, the site was
revisited. The site management had undertaken additional
identified for total phosphorus are presented in Figure 3. For four lakes (Lake Rotokawau
(NHC), Barret Lagoon (VRP), Lake Kaikura (CT) and Lake Herengawe (CT)), band C applies, while two lakes
(Lake Rotokare (SHC) and Lake Waikare (SHC)) fall within band D.
Figure 3: Draft baseline states identified for total phosphorus at six regionally representative Taranaki lakes
page
Technical Memorandum | Draft Baseline State for Taranaki Lakes (Trophic State)
inspection.
Surface water from recent rain was discharging via three of the open trenches to the coast. Several (known)
boggy areas discharging from the north trench line were contributing to ponding that was visible from the
main highway.
The Hector Place pumping station and the emergency overflow structure were also inspected and found to
be satisfactory.
6 November 2018
An influent flow of approximately 5 L/s was occurring at the time of the inspection, the influent screen was
Port Area Industrial Catchments Annual Report 2022-2023
values are not readily obtainable are not recognised. For an asset to be sold, the asset is impaired if the market price for an equivalent asset falls below its carrying amount. For an asset to be used by the Trust, the asset is impaired if the value to the Trust in using the asset falls below the carrying amount of the asset.
Work in progress is recorded at cost. Cost includes expenditure which is directly attributable to the acquisition of an asset. Capital work in progress is not
Annual Plan.
Councillors D N MacLeod (Chairman)
M J Cloke
M G Davey
D L Lean (Deputy Chairman)
M J McDonald
D H McIntyre
B K Raine
N W Walker
C S Williamson
Apologies Councillors M P Joyce and C L Littlewood
Notification of Late Items
Item Page Subject
Item 1 3 Hearing of Submissions on the Consultation Document for the
2018/2028 Long-Term Plan
Summary of Submissions
Item 2 40 Timetable of submitters who wish to be heard
Item 3 43 Officer's
page
Doc# 1915767-v1
Minutes of the Ordinary Meeting of the
Taranaki Regional Council, held
Taranaki Regional Council Chambers, 47
Cloten Road, Stratford, on Tuesday 15
August 2017 at 10.45am.
Present Councillors D N MacLeod (Chairperson)
M J Cloke
M G Davey
M P Joyce
D L Lean (Deputy Chairperson)
C L Littlewood
M J McDonald
D H McIntyre
B K Raine
N W Walker
C S Williamson
Attending Messrs B G Chamberlain (Chief
our rivers, flow and water level
changes and riparian habitat damage.”
The breadth of NIWA’s work on freshwater gives an indication
of the complexity and range of human impact.
For example, teams of scientists are working on ways to
treat human wastewater in towns and on farms, installing
fish passages in channelled waterways, reducing the flood of
rain channelled by urban and road stormwater, calculating
downstream impacts of water take, building wetlands and
riparian strips to stop
Mary Gray
42 Pia Rockell
43 Jenny Murphy
44 Emma Parker
45 Julie Lumsden
46 Gillett Troy
47 Simon Raine
48 Keith Wills
49 Geoffrey Hobson
50 Robert Taylor
51 Rachel Eckersley
52 Charl van der Heever
53 Joanne Massey
54 Nigel Cliffe
55 Jean Mallinson
56 Dr Keith and Mrs Shirley Blayney
57 Marcon Wood
58 Carol Franklyn
59 Jocelyn Kruitbosch
60 Graham Cochrane
61 Wilfred Ivan Cudlipp
62 Gordon Sole
63 Michael Bonner
64 Ben Bonner
65 Laura Elizabeth
66 Alison Rumball
67 Peter
Nitrogen also enters the Irrigation Area with rain and clover fixation.
4.4 Total volume of irrigation liquid irrigated onto the Irrigation Blocks
The irrigation liquid is pumped from the pond to the irrigator through a buried pipeline. The pumping flow rate
was measured by BTW company in 2015 as 30 m3/hr1.
1 Uruti Composting Facility Management Plan, BTW Company Limited, 2015. (provided as Appendix J of the Application for
Consent Renewal)
page
11
Irrigation Block