Infrastructure covers the physical assets such as bus stops and interchanges (hubs) as well as any on-road
bus priority (which is addressed above).
Bus stops are the responsibility of the relevant Territorial Authority. Each stop should include a sign and
yellow box road markings as a minimum, with shelters to provide passenger protection from the elements
(both rain and sun) highly desirable.
New Plymouth District Council and TRC have a constructive and collaborative working
Waste Remediation Services Symes Manawapou LF Annual Report 2023 2024
Waste Remediation Services WRS Waikaikai LF Annual Report 2023-2024
Infrastructure covers the physical assets such as bus stops and interchanges (hubs) as well as any on-road
bus priority (which is addressed above).
Bus stops are the responsibility of the relevant Territorial Authority. Each stop should include a sign and
yellow box road markings as a minimum, with shelters to provide passenger protection from the elements
(both rain and sun) highly desirable.
New Plymouth District Council and TRC have a constructive and collaborative working
Executive Audit and Risk Agenda February 2025
Beach Energy Resources Kupe Production Station Annual Report 2023-2024
and so on), but
our future will involve so much more.
Our future involves harnessing our unique
advantage – our people. “Taranaki – where talent
becomes enterprise”. We are the ones who are going
to make it happen! Increasingly it is falling on us in
the regions to lead our development and create “our
place” for ourselves.
We were appointed by the Mayoral Forum as a Lead
Team to lead the preparation of a development road
map. This is it.
We might have been given the initial lead
and attach plans of the proposed activity.
Include dimensions eg depth of excavation, deposits and a real extent
page
06/23 - Doc # 3115168 Page 14 of 20
SECTION F – Other structures
Please note this section is for all other structures that don’t fall into the categories above
8) Details of the Activity
8.1 Please ensure your Assessment of Environmental Effects contains a details of activity section
Where relevant
increase over the summer months the
groundwater levels fall in response and during the winter months, when abstraction decreases, the
groundwater levels recover.
In summary, groundwater level monitoring data gathered by the Council does not indicate any long-term
reduction in shallow or deep groundwater levels as a result of the abstraction authorised by consent 7470-
1.2. As such, the potential for adverse effects on down gradient surface water systems as a result of the
abstraction is deemed …
requirement of consent 9608, held by DR Wilson for abstraction of groundwater at a location across the
Waitotara River for irrigation of pasture land. Consent 9608 requires that abstraction ceases if the water
levels in the Silver Fern Farms supply bores GND0585 and GND1195 fall below 104 and 109 m respectively.
Consent 2261-3.1 requires that the Company record continuous water level data, to an accuracy of ±10 mm
in a dedicated monitoring bore and any operational abstraction bores.
The