Your search for 'rain fall' returned 1994 results.

Value Timber Supplies Ltd Woodwaste Disposal Annual Report 2022-2023

Ltd (For a copy of the signed resource consent please contact the TRC Consents department) page Water abstraction permits Section 14 of the RMA stipulates that no person may take, use, dam or divert any water, unless the activity is expressly allowed for by a resource consent or a rule in a regional plan, or it falls within some particular categories set out in Section 14. Permits authorising the abstraction of water are issued by the Council under Section

Annual report 2016-2017

rule in a regional plan, or it falls within some particular categories set out in Section 14. Kaupokonui Stream Fonterra Limited holds water permit 0302-3 to take and use up to 19,500 m³/day (225 litres/second) of water from the Kaupokonui Stream for cooling water and general purposes associated with lactose manufacturing. This permit was issued by the Council on 9 June 1999 under Section 87(d) of the RMA. It is due to expire on 1 June 2019. There are three special conditions

Annual report 2015-2016

discharge met the standards of Rule 22 of the Regional Freshwater Plan as a permitted activity. page 8 1.3.1 Water abstraction permits Section 14 of the RMA stipulates that no person may take, use, dam of divert any water, unless the activity is expressly allowed for by a resource consent or a rule in a regional plan, or it falls within some particular categories set out in Section 14. Kaupokonui Stream Fonterra Limited holds water permit 0302-3 to take and use up

Policy & Planning agenda July 2021

hill county farming, implementing fresh water policy, developing Farm Environmental Plans, water and stream health monitoring, predator management, fencing, planting and the collection of farm environment data. 31. The actions and priorities from across all catchment communities have subsequently been consolidated to create the Regional Integrated Plan. This plan details the costs over the next 24 months and each of the community catchment actions have been grouped to fall within one of

CPSchedule2

memory  Limited discordant elements disrupt the distinctive pattern of boulders along the river bed channel Transient values  Hangatahua (Stony) River catchment is exposed to some of the heaviest rain in New Zealand with rocks rolling down the river in accelerated river flows frequently changing its course  At other times the river is recognised for having waters so clear that it appears that it isn’t there, however this has declined in more recent years due to natural erosion

Schedule 2 - Coastal areas of outstanding value

the distinctive pattern of boulders along the river bed channel Transient values  Hangatahua (Stony) River catchment is exposed to some of the heaviest rain in New Zealand with rocks rolling down the river in accelerated river flows frequently changing its course  At other times the river is recognised for having waters so clear that it appears that it isn’t there, however this has declined in more recent years due to natural erosion higher up the catchment in Egmont National

Schedule II: Coastal areas of outstanding value

the distinctive pattern of boulders along the river bed channel Transient values  Hangatahua (Stony) River catchment is exposed to some of the heaviest rain in New Zealand with rocks rolling down the river in accelerated river flows frequently changing its course  At other times the river is recognised for having waters so clear that it appears that it isn’t there, however this has declined in more recent years due to natural erosion higher up the catchment in Egmont National

Annual report 2012-2013

managed. Minimal flaring was being undertaken with no resulting smoke or odours. No discharge was occurring from the skimmer pits but recent rain had elevated suspended solids content in the stormwater which may have required the pits to be cleaned out. 29 October 2012 No drilling was being undertaken at the time of inspection. Most of the exploration equipment had been moved to Cheal-B and C wellsites. The production facilities were neat and tidy. There was no discharge off site. Some silt