average concentrations of suspended solids in wastewater discharge, based on 24 hour
time-proportioned composite samples 20
Figure 6 Daily, average concentrations of fats in wastewater discharge, based on 24 hour time-
proportioned composite samples 21
Figure 7 Daily, average COD in wastewater discharge, based on 24 hour time-proportioned composite
samples 21
Figure 8 Map of sampling sites in relation to the outfall 25
Figure 9 Mean number of species per quadrat for summer surveys
considerations
17. This memorandum and the associated recommendations are consistent with the policy
documents and positions adopted by this Council under various legislative frameworks
including, but not restricted to, the Local Government Act 2002, the Resource Management
Act 1991 and the Local Government Official Information and Meetings Act 1987.
Iwi considerations
18. This memorandum and the associated recommendations are consistent with the
Council’s policy for the development of Māori
memorandum has been prepared in accordance with generally accepted
accounting practice.
Policy considerations
9. This memorandum and the associated recommendations are consistent with the policy
documents and positions adopted by this Council under various legislative frameworks
including, but not restricted to, the Local Government Act 2002, the Resource Management
Act 1991 and the Local Government Official Information and Meetings Act 1987.
Iwi considerations
10. This memorandum and
reporting process differ year on year? 7
Data limitations 7
CME under the Resource Management Act New Zealand 7
PART 2 - ANALYSIS
Regional Context 8
Working with Iwi 9
CME Operations (managing the workload) 10
Registering notifications 10
Complaints received 11
Complaints responded to & attended 11
Confirmed breaches 14
Monitoring resource consents 15
Compliance gradings 17
Compliance assessment 17
Monitoring permitted activities 22
and
maps and to identify where further information gathering should be focused.
The report identifies reaches of coast where better understanding coastal erosion rates is
important for management perspectives. The following reaches have been selected on the
basis of level of existing or future use and development; the existence of baseline information
from which to monitor changes; opportunities for partnerships with businesses or where the
reach is representative of a longer stretch of
Furthermore, schedule 10 of the Local Government Act 2002 requires the Council
to set out in its long-term plan any steps it intends to take to foster the development of Māori capacity to
contribute to the decision making processes over the period covered by the Plan.
There are eight recognised iwi in the region, Ngaa Rauru Kiitahi, Ngāti Ruanui, Ngāruahine, Taranaki Iwi, Te
Atiawa, Ngāti Mutunga, Ngāti Maru and Ngāti Tama. Of particular note is Ngāti Maru have signed their deed of
settlement and
4.2.2 Flows 28
4.2.3 Discharge Volume 30
4.2.4 Timing of Peak 31
4.2.5 Summary 32
5 CONCLUSIONS AND RECOMMENDATIONS 34
LIST OF FIGURES
Figure 2-1 Waitōtara Catchment 6
Figure 3-1 Waitōtara Gauge Summary Map 9
Figure 3-2 Cumulative Hourly Rainfall Depths at Gauges – June 2015 10
Figure 3-3 Gauge Data for Hydraulic Model Calibration – June 2015 11
Figure 3-4 Tidal Boundary Conditions – June 2015 11
Figure 3-5 Cumulative Hourly Rainfall Depths at Gauges –
Tamarongo and
the hapū of Ōpunakē. Diane passed away in the last week. She was a stalwart for Iwi and hapū issues
and a familiar face in local government engagement. Nō reira e te rangatira, haere, haere atū rā.
Applications
We refer to the Applications for Resource Consent received on 30 May 2018 and being: 1795-5.0;
1796-4.0; 1797-4.0; 5581-2.0; 4744-3.0; 4563-3.0; 5692-2.0; 10826-1.0 (“the Applications ”) by Ōpunakē
Power
- 26 April 2023
4
page
Date 26 April 2023, 9.00am
Venue: Taranaki Regional Council Boardroom, 47 Cloten Road, Stratford
Document: 3166312
Present S W Hughes Chairperson
D M Cram Deputy Chairperson
M J Cloke
M G Davey
D H McIntyre
B J Bigham
D L Lean (zoom)
N W Walker ex officio
C L Littlewood ex officio (zoom)
D Luke Iwi Representative
Ā White Iwi Representative
R Buttimore Iwi
Commentary/Highlights
The number of consents processed for the quarter was 90, which is similar to last year. The Environment Court has released an
interim decision on the Mt Messenger road upgrade project and consent conditions were endorsed. Appeals by iwi have been
received on the mana whenua issue. The 100% consent processing time frame compliance has been maintained, meaning
activities are not being delayed.
Outputs/Key performance indications
PERFORMANCE MEASURE ACTUAL PERFORMANCE