Your search for 'iwi map' returned 2238 results.

NPDC landfills monitoring report 2018-2019

of the monitoring programme in place for the period under review; and • a summary of the status of these three landfill sites. Each of the sites is then discussed in a separate section (Sections 2 to 4). Sub-section 1 (for example Section 2.1) presents: page 2 • a general description of the former landfill, current activities and discharges; • an aerial photograph or map showing the location of the former landfill; and • an outline of the matters covered by

Report 2011-2013

Cheal-B wellsite consent monitoring report - Taranaki Regional Council

Remediation NZ Ltd consent monitoring 2018-2019

29 Summary of performance for consent 10063-1.0 74 Table 30 Summary of performance for consent 10547-1.0 76 Table 31 RNZ consent compliance 2018-2019 79 Table 32 Evaluation of environmental performance over time 79 List of figures Figure 1 Regional location of the Company operations in Taranaki 4 Figure 2 RNZ Uruti site map 9 Figure 3 Surface water monitoring locations Uruti 10 Figure 4 RNZ Uruti groundwater monitoring well locations 11 Figure 5 RNZ Uruti

Annual report 2015-2016

Fonterra Kapuni consent monitoring report - Taranaki Regional Council.

Biennial report 2013-2015

Fonterra Kapuni consent monitoring report - Taranaki Regional Council.

Remediation NZ Ltd consent monitoring 2017-2018

Table 22 Consent environmental performance over time 59 List of figures Figure 1 Regional location of the Company operations in Taranaki 4 Figure 2 The Company’s Uruti site map 11 Figure 3 Surface water monitoring locations 12 Figure 4 Groundwater monitoring locations 13 Figure 5 The Company’s Uruti irrigation areas 14 page page 1 1 Introduction 1.1 Compliance monitoring programme reports and the Resource

Annual report 2016-2017

 the nature of the monitoring programme in place for the period under review; and  a description of the activities and operations conducted at each site. Sections 2 -14 Each company’s activity is discussed in detail in a separate section. In each subsection 1 (e.g. section 2.1) there is a general description of the industrial activity and its discharges, a photograph or map showing the location of the activity, and an outline of the matters covered by the company’s permit/s.

Annual report 2015-2016

description of the activities and operations conducted at each site. Each company’s activity is then discussed in detail in a separate section (sections 2 to 13). In each subsection 1 (e.g. section 2.1) there is a general description of the industrial activity and its discharges, a photograph or map showing the location of the activity, and an outline of the matters covered by the company’s permit/s. Subsection 2 presents the results of monitoring of the company’s activities during the