of the monitoring programme in place for the period under review; and
• a summary of the status of these three landfill sites.
Each of the sites is then discussed in a separate section (Sections 2 to 4).
Sub-section 1 (for example Section 2.1) presents:
page
2
• a general description of the former landfill, current activities and discharges;
• an aerial photograph or map showing the location of the former landfill; and
• an outline of the matters covered by
Rat, stoat and possum control - techniques, successes, challenges - Department of Conservation
Cheal-B wellsite consent monitoring report - Taranaki Regional Council
29 Summary of performance for consent 10063-1.0 74
Table 30 Summary of performance for consent 10547-1.0 76
Table 31 RNZ consent compliance 2018-2019 79
Table 32 Evaluation of environmental performance over time 79
List of figures
Figure 1 Regional location of the Company operations in Taranaki 4
Figure 2 RNZ Uruti site map 9
Figure 3 Surface water monitoring locations Uruti 10
Figure 4 RNZ Uruti groundwater monitoring well locations 11
Figure 5 RNZ Uruti
Fonterra Kapuni consent monitoring Annual report 2016-2017
Fonterra Kapuni consent monitoring report - Taranaki Regional Council.
Fonterra Kapuni consent monitoring report - Taranaki Regional Council.
Table 22 Consent environmental performance over time 59
List of figures
Figure 1 Regional location of the Company operations in Taranaki 4
Figure 2 The Company’s Uruti site map 11
Figure 3 Surface water monitoring locations 12
Figure 4 Groundwater monitoring locations 13
Figure 5 The Company’s Uruti irrigation areas 14
page
page
1
1 Introduction
1.1 Compliance monitoring programme reports and the Resource
the nature of the monitoring programme in place for the period under review; and
a description of the activities and operations conducted at each site.
Sections 2 -14 Each company’s activity is discussed in detail in a separate section.
In each subsection 1 (e.g. section 2.1) there is a general description of the industrial activity and its
discharges, a photograph or map showing the location of the activity, and an outline of the matters covered
by the company’s permit/s.
description of the activities and operations conducted at each site.
Each company’s activity is then discussed in detail in a separate section (sections
2 to 13).
In each subsection 1 (e.g. section 2.1) there is a general description of the industrial
activity and its discharges, a photograph or map showing the location of the activity,
and an outline of the matters covered by the company’s permit/s.
Subsection 2 presents the results of monitoring of the company’s activities during the