Lower Waiwhakaiho Catchment Annual Report 2022-2023
2013 to 30 June 2014 20
Figure 6 Examples of river flows at Rimu Street during periods of 400 l/s (a), 600
l/s (b) , and 700 l/s (c) residual flow releases and daylight (950 l/s)
generation flow compliance during the 2013-2014 period 21
Figure 7 Water temperature monitoring sites (W1, W5, W7) in the lower
Waiwhakaiho River catchment 24
Figure 8 Aerial location map of monitoring sites 25
Figure 9 Water temperature ( C) in the Waiwhakaiho River (Egmont Village – SH3
(upper), Hydro
2014-2015 period 21
Figure 7 Water temperature monitoring sites (W1, W5, W7) in the lower
Waiwhakaiho River catchment 24
Figure 8 Aerial location map of monitoring sites 25
Figure 9 Water temperature (˚C) in the Waiwhakaiho River (Egmont Village – SH3
(upper), Hydro Road (centre), and Rimu Street (lower)), for the period 1
July 1992 to 30 June 2015 27
Figure 10 Instantaneous water temperature differences (˚C) between Waiwhakaiho
River sites during the monitoring period – SH3 and
use.
2.4 Contingency plan
Taranaki Ventures Limited has provided a general contingency plan, as required by
Condition 4 of resourse consent 9423-1 with site specific maps which cover all
onshore sites that they operate. The contingency plan has been reviewed and
approved by officers of the Council.
2.5 Investigations, interventions and incidents
The Council operates and maintains a register of all complaints or reported and
discovered excursions from acceptable limits and
Greymouth Petroleum Ngatoro G consent monitoring programme - Taranaki Regional Council.
Trustpower Pātea hydro power scheme resource consent monitoring report 2019-2020
List of figures
Figure 1 Regional map showing locations of Remediation NZ’s Taranaki sites 5
Figure 2 RNZ site, Mokau Road, Uruti 6
Figure 3 Freshwater sampling sites at RNZ Uruti sites 14
Figure 4 Irrigation and groundwater bores at RNZ Uruti sites 15
Figure 5 Total dissolved solids in groundwater 27
Figure 6 Graph showing sodium absorption ratio in soil of both irrigation areas 29
Figure 7 Aerial view of Remediation NZ’s Waitara and Pennington Rd sites 36
page
section 2.1) there is a general description of the industrial activity and associated
discharges, a photograph or map showing the location of the activity, and an outline of the matters covered
by the company’s permit/s.
Subsections 2 and 3 present the monitoring results of the company’s activities during the period under
review, including scientific and technical data, and any information on the Council’s Register of Incidents.
Section 16 discusses the results of the monitoring of the
Todd Petroluem Mining Co Kapuni produciton station consent monitoring report 2017-2018