Quarterly Operational Report December 2015

landholders. Prepare plans covering 1,000 hectares of land use capability mapping in the hill country and 100 riparian plans in the intensive water management zone. By the end of the period of this Plan, it is intended to have active or completed riparian plans in place for over 99% of dairy farms (approximately 1,680) and active comprehensive farm plans in place for over 69% of hill country in private ownership where approximately 840 sheep and beef farms are located.

Annual report 2012-2013

(%change/yr) >1%) 67 Table 40 p-values (%) and trend slopes (% change per year) for flow and seasonally adjusted water quality variables at 11 Taranaki sites 68 Table 41 Comparison of 2012-2013 water quality with previous long-term (1995-2012) data (using median values) for each SEM site 75 page iv List of figures Figure 1 Freshwater physicochemical SEM sampling sites 5 Figure 2 Freshwater physicochemical SEM sampling sites aerial map 6

Annual report 2010-2011

physicochemical SEM sampling sites aerial map 6 Figure 3 Flow record for the Mangaoraka Stream at Corbett Road 15 Figure 4 Flow record for the Waiwhakaiho River at SH3 Egmont Village 20 Figure 5 Flow record for the Punehu Stream at SH45 33 Figure 6 Flow record for the Waingongoro River at Eltham Road 38 Figure 7 Flow record for the Waingongoro River at SH45 42 Figure 8 Flow record for the Patea River at Skinner Road 50 Figure 9 Flow record for the Mangaehu River at Raupuha Road 55

Annual report 2011-2012

sampling sites 5 Figure 2 Freshwater physicochemical SEM sampling sites aerial map 6 Figure 3 Flow record for the Mangaoraka Stream at Corbett Road 15 Figure 4 Flow record for the Waiwhakaiho River at SH3 Egmont Village 20 Figure 5 Flow record for the Punehu Stream at SH45 32 page iv Figure 6 Flow record for the Waingongoro River at Eltham Road 37 Figure 7 Flow record for the Waingongoro River at SH45 41 Figure 8 Flow record for the Patea River at Skinner Road 49

Annual report 2013-2014

Taranaki sites. 69 Table 41 Comparison of 2013-2014 water quality with previous long-term (1995-2013) data (using median values) for each SEM site 76 page iv List of figures Figure 1 Freshwater physicochemical SEM sampling sites 5 Figure 2 Freshwater physicochemical SEM sampling sites aerial map 6 Figure 3 Flow record for the Mangaoraka Stream at Corbett Road 14 Figure 4 Flow record for the Waiwhakaiho River at SH3 Egmont Village 20 Figure

Annual report 2012-2013

Fonterra Kapuni consent monitoring report - Taranaki Regional Council.

Trustpower Ltd Motukawa HEP Scheme Annual Report 2020 2021

percentage of total days monitored. Data has been split into pre-400 L/s residual flow (1992-2002) and post 400 L/s residual flow (2002-2019), previous period (2019-20), and current year (2020-21) 20 Figure 9 Manganui River water temperature differences between sites upstream and downstream of the Motukawa HEP weir compared with the flow in the Manganui River at Everett Park from 8 November to 8 December 2018 21 Figure 10 Map showing sampled sites with current survey results 22 Figure 11

Report 2012-2013

dairy farming area. Relatively minor earthworks were required to construct the site. The land had not been reinstated at page the time of the last inspection on 13 June 2013 as the well was still currently producing, and the site is still in use. 2.4 Contingency plan TAG Oil (NZ) Limited has provided a general contingency plan, as required by Condition 4 of recourse consent 7595-1 with site specific maps which cover all onshore sites that they operate. The

20 56 Trustpower Ltd Motukawa HEP Scheme Monitoring Programme Annual Report 2020 2021 2877409 v2

percentage of total days monitored. Data has been split into pre-400 L/s residual flow (1992-2002) and post 400 L/s residual flow (2002-2019), previous period (2019-20), and current year (2020-21) 20 Figure 9 Manganui River water temperature differences between sites upstream and downstream of the Motukawa HEP weir compared with the flow in the Manganui River at Everett Park from 8 November to 8 December 2018 21 Figure 10 Map showing sampled sites with current survey results 22 Figure 11