Location Site code Map Reference
1 Urenui River SH3 bridge URN000420 1721404 - 5682968
1a Urenui River Footbridge URN000440 1720608 - 5682914
2 Urenui River at mouth URN000480 1720245 - 5683370
3 Sea coast approx. 200 m east of river mouth SEA900072 1720582 - 5683563
4 Sea coast at east end of beach SEA900070 1720803 - 5683667
The bridge on State Highway 3 (Site 1) had previously been used as the upstream
sampling site, however, this site is no longer safe to sample from. The
(2018-2019) 24
Table 21 Phytoplankton found at site L2 in Lake Rotorangi during the 2018-2019 period 26
Table 22 Phytoplankton found at site L3 in Lake Rotorangi during the 2018-2019 period 28
page
iii
List of figures
Figure 1 Aerial location map of Lake Rotorangi water quality sampling sites for 2018-2019 (LRT000300
and LRT000450) 6
Figure 2 Synthetic inflow at Lake Rotorangi for the period 1 July 2018 to 30 June 2019 8
Figure 3 Temperature (°C) and dissolved
monitoring programme 7
Table 4 Surface water monitoring site details 8
Table 5 Results of groundwater sampling carried out in relation to the Mangahewa-3 fracturing
event 12
Table 6 Results of hydraulic fracturing fluid sampling 14
Table 7 Results of hydraulic fracturing return fluid sampling 14
Table 8 Summary of performance for consent 7971-2 17
Table 9 Evaluation of environmental performance over time 18
List of figures
Figure 1 Location map 5
Figure 2 Surface
undertaken to identify any hazards to water skiing, and in reporting this survey provide
recommendations on how to avoid, remedy or mitigate these hazards. Condition 15 then requires the
publication of a full set of maps identifying these hazards to be erected at various locations and distributed
to various parties.
Condition 16 requires the consent holder to construct and maintain a floating pontoon to allow improved
access for boating at Pukekino Landing while condition 17 requires the
publication of a full set of maps identifying these hazards to be erected at various locations and distributed
to various parties.
Condition 16 requires the consent holder to construct and maintain a floating pontoon to allow improved
access for boating at Pukekino Landing while condition 17 requires the electronic recording of the water
level of Lake Rotorangi, and the provision of records to Council.
Conditions 18 to 22 relate to the provision of upstream and downstream fish passage
publication of a full set of maps
identifying these hazards to be erected at various locations and distributed to various
parties.
Condition 17 requires the consent holder to construct and maintain a floating pontoon
to allow improved access for boating at Pukekino Landing while condition 18 requires
the electronic recording of the water level of Lake Rotorangi, and the provision of
records to Council.
Conditions 19 to 23 relate to the provision of upstream and downstream fish passage
Taranaki Trucking Company Limited’s
cleanfill, Cardiff Road 58
Table 26 Summary of performance for consent 5561-1 To discharge of
cleanfill onto and into land 59
Table 27 Summary of performance for consent 6280-1 to culvert an
unnamed tributary of the Waingongoro River 60
Table 28 Summary of performance for consent 9411-11 To discharge
of cleanfill onto and into land (where it may enter water). 64
List of figures
Figure 1 Regional map showing the locations of cleanfills
Agenda for Ordinary Council meeting April 2017.
Figure 17 Taranaki Sawmills PM10 µg/m³ one hour average for 2019-2020 deployment period 73
Figure 18 Aerial view of TBS Coatings site and associated monitoring sites 79
Figure 19 Aerial view of Woodwards’ property and fire pit 85
Figure 20 Aerial map showing site and sample locations in the Waitaha Catchment 93
page
page
1
1 Introduction
1.1 Compliance monitoring programme reports and the Resource
Management Act 1991
1.1.1 …