Your search for 'iwi map' returned 2191 results.

Biennial report 2012-2014

Location Site code Map Reference 1 Urenui River SH3 bridge URN000420 1721404 - 5682968 1a Urenui River Footbridge URN000440 1720608 - 5682914 2 Urenui River at mouth URN000480 1720245 - 5683370 3 Sea coast approx. 200 m east of river mouth SEA900072 1720582 - 5683563 4 Sea coast at east end of beach SEA900070 1720803 - 5683667 The bridge on State Highway 3 (Site 1) had previously been used as the upstream sampling site, however, this site is no longer safe to sample from. The

Lake Rotorangi monitoring report 2018-2019

(2018-2019) 24 Table 21 Phytoplankton found at site L2 in Lake Rotorangi during the 2018-2019 period 26 Table 22 Phytoplankton found at site L3 in Lake Rotorangi during the 2018-2019 period 28 page iii List of figures Figure 1 Aerial location map of Lake Rotorangi water quality sampling sites for 2018-2019 (LRT000300 and LRT000450) 6 Figure 2 Synthetic inflow at Lake Rotorangi for the period 1 July 2018 to 30 June 2019 8 Figure 3 Temperature (°C) and dissolved

Mangahewa C hydraulic fracturing report 2018-2019

monitoring programme 7 Table 4 Surface water monitoring site details 8 Table 5 Results of groundwater sampling carried out in relation to the Mangahewa-3 fracturing event 12 Table 6 Results of hydraulic fracturing fluid sampling 14 Table 7 Results of hydraulic fracturing return fluid sampling 14 Table 8 Summary of performance for consent 7971-2 17 Table 9 Evaluation of environmental performance over time 18 List of figures Figure 1 Location map 5 Figure 2 Surface

Trustpower Patea hydro consent monitoring 2017-2018

undertaken to identify any hazards to water skiing, and in reporting this survey provide recommendations on how to avoid, remedy or mitigate these hazards. Condition 15 then requires the publication of a full set of maps identifying these hazards to be erected at various locations and distributed to various parties. Condition 16 requires the consent holder to construct and maintain a floating pontoon to allow improved access for boating at Pukekino Landing while condition 17 requires the

Annual report 2016-2017

publication of a full set of maps identifying these hazards to be erected at various locations and distributed to various parties. Condition 16 requires the consent holder to construct and maintain a floating pontoon to allow improved access for boating at Pukekino Landing while condition 17 requires the electronic recording of the water level of Lake Rotorangi, and the provision of records to Council. Conditions 18 to 22 relate to the provision of upstream and downstream fish passage

Annual report 2015-2016

publication of a full set of maps identifying these hazards to be erected at various locations and distributed to various parties. Condition 17 requires the consent holder to construct and maintain a floating pontoon to allow improved access for boating at Pukekino Landing while condition 18 requires the electronic recording of the water level of Lake Rotorangi, and the provision of records to Council. Conditions 19 to 23 relate to the provision of upstream and downstream fish passage

Annual report 2013-2014

Taranaki Trucking Company Limited’s cleanfill, Cardiff Road 58 Table 26 Summary of performance for consent 5561-1 To discharge of cleanfill onto and into land 59 Table 27 Summary of performance for consent 6280-1 to culvert an unnamed tributary of the Waingongoro River 60 Table 28 Summary of performance for consent 9411-11 To discharge of cleanfill onto and into land (where it may enter water). 64 List of figures Figure 1 Regional map showing the locations of cleanfills

Agenda

Agenda for Ordinary Council meeting April 2017.

Waitaha catchment consent monitoring 2019-2020

Figure 17 Taranaki Sawmills PM10 µg/m³ one hour average for 2019-2020 deployment period 73 Figure 18 Aerial view of TBS Coatings site and associated monitoring sites 79 Figure 19 Aerial view of Woodwards’ property and fire pit 85 Figure 20 Aerial map showing site and sample locations in the Waitaha Catchment 93 page page 1 1 Introduction 1.1 Compliance monitoring programme reports and the Resource Management Act 1991 1.1.1 …