Your search for 'iwi map' returned 2244 results.

ANZCO Eltham Ltd Annual Report 2022-2023

means of provision of data The annual report will contain: • The results of wastewater, groundwater and soil samples taken; • A map showing the location of the soil samples; • The nitrogen budget outlining all input and output quantities and qualities; • A record of any complaints received about the discharge; • The results of any self- compliance assessment; and • Any remedial measures taken by ANZCO in relation to any complaints received or any potential

Annual report 2014-2015

operational prior to the diversion of wastewater to the Hawera WWTP in the 2010-2011 period 8 Figure 2 Aerial view of the Eltham WWTP showing the sludge geo- textile bags disposal area 8 Figure 3 Location of sampling sites in relation to the Eltham wastewater treatment system 22 Figure 4 Location map of sampling sites in relation to the Eltham WWTP 23 Figure 5 Trend in MCI at the Mangawhero Stream site downstream of the Mangawharawhara Stream confluence (MWH000490) 30 Figure 6

Annual report 2013-2014

closure earthworks 44 page v List of figures Figure 1 Regional map of STDC landfills 5 Figure 2 Aerial view of Hawera landfill and sampling sites 15 Figure 3 Aerial image of Otakeho landfill and Taikatu stream 22 Figure 4 Eltham landfill and sampling sites 27 Figure 5 Aerial view of Manaia landfill showing sampling sites and landfill footprint 31 Figure 6 Aerial view of Opunake landfill foot print and sampling sites 36 Figure 7 Aerial view of the landfill

Fonterra Whareroa Monitoring Programme Annual Report 2021-2022

time-proportioned composite samples 22 Figure 8 Map of sampling sites in relation to the outfall 25 Figure 9 Mean number of species per quadrat for summer surveys (1986-2022) 26 Figure 10 Mean Shannon-Weiner Indices per quadrat for summer surveys (1986-2022) 26 Figure 11 Location of air deposition sites 28 Figure 12 Milk powder fallout at air deposition sites surrounding Whareroa (September to December 2021) 29 Figure 13 PM10 concentrations (µg/m³) at the Whareroa dairy complex 30

Todd Energy Mangahewa-D hydraulic fracturing 2016-2019

Glossary of common terms and abbreviations 25 Bibliography and references 27 Appendix I Resource consent held by Todd Energy Ltd Appendix II Certificates of analysis (groundwater) Appendix III Certificates of analysis (hydraulic fracturing fluids) Appendix IV Biomonitoring Reports Appendix V Todd Sediment Results Map List of tables Table 1 Summary of hydraulic fracturing details 6 Table 2 Details of groundwater sites included in the monitoring

Annual report 2013-2014

stockpiling facility, showing locations of the storage pits and sampling sites, with approximate regional location (inset) 26 Figure 5 Biomonitoring sites in an unnamed tributary of the Mangatengehu Stream in relation to the Surrey Road stockpiling facility 37 Figure 6 Aerial map of the extent of Colin Boyd's property and landspread areas as of March 2014 40 Figure 7 Council soil sampling transect locations at Colin Boyd's property during the 2013-2014 monitoring period 45 List

Annual report 2015-2016

WGG000900 Patea River at Barclay Road PAT000200 Patea River at Skinner Road PAT000360 Mangaehu River at Raupuha Road MGH000950 Whenuakura River at Nicholson Road WNR000450 Waitara River at Autawa Road WTR000540 All sites are described in detail and referenced with location maps, photographs, GPS and map references on the internal electronic TRC site index card system which is integrated into the existing LAB water quality computer and Taradise GIS databases. A brief

Annual report 2016-2017

contingency plan for the site. Conditions 22 and 23 require the consent holder to meet with Council, iwi and interested parties regarding the operation and monitoring of the consent. Condition 24 is a review provision. NPDC holds discharge permit 2982-4 to cover the discharge of up to 60 m3/day of leachate from a sludge stabilisation lagoon to groundwater in the vicinity of the Waiwhakaiho River. This permit was issued by the Council on 17 October 2002 under Section 87(e) of the RMA. It

Annual report 2014-2015

must pass through. Conditions 12 to 18 relates to monitoring requirements. Condition 19 requires the consent holder to provide a technology report on two occasions, while Condition 20 requires an annual report. Condition 21 states that the consent holder must maintain a contingency plan for the site. Conditions 22 and 23 require the consent holder to meet with Council, iwi and interested parties regarding the operation and monitoring of the consent. Condition 24 is a review

Irrigation consent monitoring 2018-2019

List of figures Figure 1 Percentage of water irrigation allocation per activity in the Taranaki region 4 Figure 2 Source of water for irrigation in Taranaki during the 2018-2019 period 4 Figure 3 Total consented water abstractions – distributed by activity 2018-2019 4 Figure 4 Pasture irrigation zones and locations of consented irrigation in Taranaki 5 Figure 5 Distribution map of the total rainfall recorded from 1 October 2018 to 31 March 2019 10 List of photos Photo 1