consent 6280-1 75
List of figures
Figure 1 Regional map showing the locations of the cleanfills monitored under this programme during
the year under review 5
Figure 2 AA Contracting Ltd cleanfill and sampling sites at Henwood Road, New Plymouth 11
Figure 3 A & A George Family Trust cleanfill at Dudley Road, Inglewood 16
Figure 4 AE Riddick's cleanfill and sampling site at Carrington Road, New Plymouth 20
Figure 5 BJ & LB Bishop's cleanfill sand sampling sites at Ahu Ahu,
conditions the consent holder must supply the Council with an
annual report to satisfy the following condition.
‘The consent holder shall keep records of the following:
a) Wastes from each individual well
b) Composition of wastes
c) Stockpiling area
d) Volumes of material stockpiled
e) Landfarming areas, including maps
f) Volumes and weights of wastes landfarmed
g) Dated of commencement and completion of stockpiling and landfarming events
h) Treatments applied
page
13
Daily, average concentrations of fats in wastewater discharge, based on 24 hour flow-
proportioned composite samples 33
Figure 8 Daily, average COD in wastewater discharge, based on 24 hour flow-proportioned composite
samples 33
Figure 9 Map of sampling sites in relation to the outfall 37
Figure 10 Mean number of species per quadrat for spring surveys (1992-2017) 38
Figure 11 Mean Shannon-Weiner indices per quadrat for spring surveys (1992-2017) 38
Figure 12 Mean number of
industry, and where composting and “a worm driven waste management industry” are seen as viable
alternatives to land fill.
2.2 Location
The site where the activities take place is located on State Highway 3 (1460 Mokau Road) approximately 2
kilometres south of the Uruti Village and lies within the catchment of the Haehanga Stream, which is a
tributary of the Mimitangiatua River. The legal Description is Pt Sec 4 Blk 11 Upper Waitara SD. A copy of the
title and a map of the property are …
to date 65
Table 20 Summary of performance for TPJ Partnership’s culvert installation consent 10209-1.1 66
Table 21 Summary of performance for Taranaki Trucking Company Ltd's cleanfill consent 5561-1 71
page
vii
List of figures
Figure 1 Regional map showing the locations of the cleanfills monitored under this programme during
the year under review 5
Figure 2 AA Contracting Ltd cleanfill and sampling sites at Henwood Road, New Plymouth 11
Figure 3 A & A
Wai-iti Beach Retreat monitoring report 2018-2019
for Patea closed landfill stormwater and sediment consent 7268-1 43
List of figures
Figure 1 Regional map of STDC closed landfills 6
Figure 2 Eltham landfill and sampling sites (not currently monitored) 7
Figure 3 Aerial view of Hawera landfill and sampling sites 11
Figure 4 Hawera landfill leachate chloride concentration; 1999-2021 13
page
v
Figure 5 Hawera landfill leachate filtered chemical oxygen demand; 1999-2021 13
Figure 6 Hawera landfill
to
stabilise the riverbank in this area.
page
Figure 2: Catchment Map
page
3. Future channel management
3.1. Scheme works area
Figure 7 shows the extents of the Schemes Rivers which are included in the works area. Close
examination of 2002 and 2016 aerial photographs however show that most of the clearing works on the
Waitotara River occurred in the river between the Lime Works Bridge and the Moumahaki confluence
and in the Moumahaki
TRC Annual Report 2017/2018 - community outcomes
List of figures
Figure 1 Sampling sites in the Kurapete Stream in relation to Inglewood
oxidation ponds 15
Figure 2 Aerial location map 15
Figure 3 Riparian plans prepared in the Kurapete Stream catchment to June
2015 20
page
1
1. Introduction
1.1 Compliance monitoring programme reports and the Resource
Management Act 1991
1.1.1 Introduction
This report is the Annual Report for the period July 2014 to June 2015 by the
Taranaki Regional