gauges are showing rain below normal, while
most other locations are close to or above normal. Cape Egmont remains at over 200% of
normal to date and has already received 80% of a typical years rain in 5 months. Note: In
last months rain total maps the values for Taungatara were incorrectly displayed at Glen
Rd. The values for April at Glenn Road were 46/46% and 487/171%.
Table 1: Rainfall for May and the year to date at 27 rain gauge sites in Taranaki.
page
Monthly Year to Date
licence (CSL)
1.30pm Predator Free NZ: Data Capture Tools
1.45pm Elise Smith: MAIN Trust - mapping and data analysis
2.00pm Action in Taranaki: (10 minute sessions)
Conrad O'Carroll: Parininihi / Whitecliffs
Bob Schumacher: Pouiatoa
Gemma Green: Predator control on the Maunga
David Cockeram: Tom and Don's Bush KNE
Kris Grabow: Community kiwi protection
3.00pm Discussion opportunity to share ideas
3.20pm Evaluation
3.30pm Approx. finish
WORKSHOP
licence (CSL)
1.30pm Predator Free NZ: Data Capture Tools
1.45pm Elise Smith: MAIN Trust - mapping and data analysis
2.00pm Action in Taranaki: (10 minute sessions)
Conrad O'Carroll: Parininihi / Whitecliffs
Bob Schumacher: Pouiatoa
Gemma Green: Predator control on the Maunga
David Cockeram: Tom and Don's Bush KNE
Kris Grabow: Community kiwi protection
3.00pm Discussion opportunity to share ideas
3.20pm Evaluation
3.30pm Approx. finish
WORKSHOP
periphyton in rivers (modified from NPS-FM 2020) 19
Table 12 Summary of performance for consent 0196-5 23
Table 13 Evaluation of environmental performance over time 24
List of figures
Figure 1 Influent phosphorus and mean concentration over 180 days 9
Figure 2 Effluent nitrate 10
Figure 3 Aerial location map of sampling sites in relation to Stratford WWTP 12
Figure 4 Taxa number, MCI scores and SQMCI scores for biomonitoring sites in the Patea River
(spring) 15
page
under review N/A
7. Disturbance to comply with
noise standards No maintenance during period under review N/A
8. Survey and map of position of
pipeline to be provided Provided by consent holder Yes
page
20
Purpose: To erect, place, use, reconstruct, alter, extend and maintain within the coastal marine area up to six
pipelines connecting an offshore wellhead/platform to the foreshore at mean high water spring, with
structures situated under the seabed from …
Agenda for Policy & Planning Committee May 2017.
Todd Energy Ltd Deep Well Injection Annual Report 2021-2022
Resource Management
page
Consent 10884-1.0
Page 5 of 5
Map showing cleanfill location
Map showing extent of cleanfill discharge (approximate)
monitoring in relation to the Trust’s site 7
Table 4 Incidents, investigations, and interventions summary table 8
Table 5 Example Summary of performance for consent 1281-4 9
Table 6 Evaluation of environmental performance over time 10
List of figures
Figure 1 Aerial location map of Hickman JD 1997 Family Trust 3
Figure 2 Location of the Hickman JD Family Trust site and associated sampling sites 7
page
1
1 Introduction
1.1 Compliance monitoring
A Study into the Use of Prosecutions under the Resource Management Act (Ministry for the Environment, 2013).