Your search for 'iwi map' returned 2244 results.

May 2022 hydrology report

gauges are showing rain below normal, while most other locations are close to or above normal. Cape Egmont remains at over 200% of normal to date and has already received 80% of a typical years rain in 5 months. Note: In last months rain total maps the values for Taungatara were incorrectly displayed at Glen Rd. The values for April at Glenn Road were 46/46% and 487/171%. Table 1: Rainfall for May and the year to date at 27 rain gauge sites in Taranaki. page Monthly Year to Date

Predator Control Workshop flyer 2015

licence (CSL) 1.30pm Predator Free NZ: Data Capture Tools 1.45pm Elise Smith: MAIN Trust - mapping and data analysis 2.00pm Action in Taranaki: (10 minute sessions) Conrad O'Carroll: Parininihi / Whitecliffs Bob Schumacher: Pouiatoa Gemma Green: Predator control on the Maunga David Cockeram: Tom and Don's Bush KNE Kris Grabow: Community kiwi protection 3.00pm Discussion opportunity to share ideas 3.20pm Evaluation 3.30pm Approx. finish WORKSHOP

Predator2015

licence (CSL) 1.30pm Predator Free NZ: Data Capture Tools 1.45pm Elise Smith: MAIN Trust - mapping and data analysis 2.00pm Action in Taranaki: (10 minute sessions) Conrad O'Carroll: Parininihi / Whitecliffs Bob Schumacher: Pouiatoa Gemma Green: Predator control on the Maunga David Cockeram: Tom and Don's Bush KNE Kris Grabow: Community kiwi protection 3.00pm Discussion opportunity to share ideas 3.20pm Evaluation 3.30pm Approx. finish WORKSHOP

SDC Stratford WWTP Annual Report 2022-2023

periphyton in rivers (modified from NPS-FM 2020) 19 Table 12 Summary of performance for consent 0196-5 23 Table 13 Evaluation of environmental performance over time 24 List of figures Figure 1 Influent phosphorus and mean concentration over 180 days 9 Figure 2 Effluent nitrate 10 Figure 3 Aerial location map of sampling sites in relation to Stratford WWTP 12 Figure 4 Taxa number, MCI scores and SQMCI scores for biomonitoring sites in the Patea River (spring) 15 page

Kupe PS consent monitoring 2019-2020

under review N/A 7. Disturbance to comply with noise standards No maintenance during period under review N/A 8. Survey and map of position of pipeline to be provided Provided by consent holder Yes page 20 Purpose: To erect, place, use, reconstruct, alter, extend and maintain within the coastal marine area up to six pipelines connecting an offshore wellhead/platform to the foreshore at mean high water spring, with structures situated under the seabed from …

Agenda

Agenda for Policy & Planning Committee May 2017.

JD Hickman consent monitoring 2020-2021

monitoring in relation to the Trust’s site 7 Table 4 Incidents, investigations, and interventions summary table 8 Table 5 Example Summary of performance for consent 1281-4 9 Table 6 Evaluation of environmental performance over time 10 List of figures Figure 1 Aerial location map of Hickman JD 1997 Family Trust 3 Figure 2 Location of the Hickman JD Family Trust site and associated sampling sites 7 page 1 1 Introduction 1.1 Compliance monitoring