based muds), from hydrocarbon exploration and
production activities, onto and into land via landfarming 25
List of figures
Figure 1 Aerial photograph showing the location and approximate extent of the
Symes Manawapou Landfarm and approximate regional location (inset) 7
Figure 2 Remediation (NZ) Limited supplied map showing previously spread and
completed areas Stage 1 & 2, and the recently spread area Stage 3 which
was spread in the 2013-2014 monitoring period 15
Figure
A Study into the Use of Prosecutions under the Resource Management Act (Ministry for the Environment, 2013).
page
175
CO AS TAL P L AN F O R TARANAK I S chedu le 5 – S i t e s o f geo l og i ca l s ign i f i c ance
Schedule 5 – Sites of geological significance
This schedule identifies sites identified in the Geological Society of New Zealand’s Inventory and Maps of Important Geological Sites and Landforms in the Taranaki and Wanganui Regions
1996. Sites locations are approximate only and are not intended to provide a definitive location or extent of a
a description of the activities and operations conducted in the catchment.
Sections 2-15 separately detail each company’s onsite activities and performance.
page
3
In each subsection 1 (e.g. section 2.1) there is a general description of the industrial activity and associated
discharges, a photograph or map showing the location of the activity, and an outline of the matters covered
by the company’s permit/s.
Subsections 2 and 3 present the monitoring results of
Resource Management
page
Consent 10884-1.0
Page 5 of 5
Map showing cleanfill location
Map showing extent of cleanfill discharge (approximate)
monitoring in relation to the Trust’s site 7
Table 4 Incidents, investigations, and interventions summary table 8
Table 5 Example Summary of performance for consent 1281-4 9
Table 6 Evaluation of environmental performance over time 10
List of figures
Figure 1 Aerial location map of Hickman JD 1997 Family Trust 3
Figure 2 Location of the Hickman JD Family Trust site and associated sampling sites 7
page
1
1 Introduction
1.1 Compliance monitoring
under review N/A
7. Disturbance to comply with
noise standards No maintenance during period under review N/A
8. Survey and map of position of
pipeline to be provided Provided by consent holder Yes
page
20
Purpose: To erect, place, use, reconstruct, alter, extend and maintain within the coastal marine area up to six
pipelines connecting an offshore wellhead/platform to the foreshore at mean high water spring, with
structures situated under the seabed from …
Cemetery location map 4
Figure 2 Burial Plan for first five years of operation 9
Figure 3 Groundwater elevations 2020-2021 in comparison to rainfall 24
Figure 4 Groundwater levels GND2623, GND2625 and GND2624 compared to minimum required water
table depths by burial type 25
Figure 5 Groundwater levels GND2484 and GND3032 compared to minimum required water table
depths by burial type 26
Figure 6 Type of internment planned for Area-A and Area-B 28
page
1
air quality with
consistently low levels of nitrogen oxides (calculated one-hour average). See map below for SEM site locations.
In 2012, the Council also monitored two industrial sites as part of consent compliance monitoring: Fonterra’s
Whareroa dairy factory generation plant and Downer EDI’s asphalt and bitumen plant. Four samples were
taken at each site.
Results from this monitoring found that NOx concentrations at the Fonterra site were comparable with SEM
monitoring sites
Agenda for Policy & Planning Committee May 2017.